Framing
To be made after the roof, all framing, fire blocking and bracing is in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete and shall at a minimum include: Window/door framing installation, Vertical cells/columns, Lintel/tie beams, Framing/trusses/bracing/connectors, Draft stopping/fire-blocking, Curtain wall framing, Energy insulation, Accessibility.
Sheathing / Cladding
To be made either as part of a dry-in inspection or done separately at the request of the contractor after all roof and wall sheathing and fasteners are complete and shall at a minimum include: Roof & Wall sheathing, Sheathing fasteners, Roof/wall/dry-in, and Windows/door bucks.
Roof
Shall at a minimum include: Dry-in, Insulation, Roof coverings, and Flashings.
Fire Resistance Rated/Penetration
To be made after the installation of fire resistant drywall, joint/penetration protection, and fireproofing materials, and prior to installation of finishes.
Building Final
To be made after the shell is completed and all required Phased: Finish permits are final.
For further information, please refer to Inspection Requirements and Codes.