Posted Date
South Lois Ave at the intersection of West Watrous Ave will be closed from April 3, 2020 at 9:00 AM through April 24, 2020 at 4:00 PM as part of the Upper Peninsula Stormwater Capital Improvement Project. A city contractor will be installing 8’x5’ stormwater box culvert and relocating 8” water main. Pedestrian access will be maintained at the intersection during construction.

See all road closures at www.tampagov.net/RoadClosures
For additional information, please contact:
John Zemina, Kimmins Contracting Corp.
813-924-5010, jzemina@kimmins.com
Albert “P.J.” Calloway
Chief Construction Engineer, Contract Administration Department – Construction Management
(813) 630-3902; (813) 433-6183 (c)