Tampa Theatre from the Cheap Seats Merge Detail Vignette

Full Road Closure of Bayshore Boulevard to begin July 19, 2021 for Stormwater Infrastructure Repairs

Posted Date

A portion of Bayshore Boulevard between W Averill Avenue and Shore Breeze Drive will close at 9 am beginning July 19, 2021. City Crews will be performing stormwater box culvert repairs.

The Bayshore Gate at MacDill Air Force Base will be closed during construction. Barricades and traffic control signs will be located in the area to assist with traffic flow.

Sidewalks in the work area will be closed during construction.  Pedestrians will be detoured to other available sidewalks with signage.

All lanes on Bayshore Boulevard between W Averill Avenue and Shore Breeze Drive will be open to traffic by 3 pm on Friday, July 23rd 2021, weather permitting.

The City of Tampa recommends that motorists use alternate routes to avoid traffic congestion. Northbound and Southbound traffic motorists can use S MacDill Avenue in lieu of Bayshore Boulevard.

 CWS-21-0000472

For additional information, please contact:

Bryan Rodger, Operations Division Manager

City of Tampa Mobility Department

(813) 274-3101

Bryan.Rodger@tampagov.net