Turning in tampa

Temporary Lane Closure on E 7th Avenue January 15, 2022 for Building Maintenance

Posted Date

A portion of E 7th Avenue between N 21st Street/N 22nd Street and Nick Nuccio Parkway will close from 8:00 am to 2:00 pm on Saturday, January 15, 2022, for building maintenance.  A private contractor will be using a lift in the westbound lane of E 7th Avenue between N 16th Street and N 15th Street to hang a sign.  The westbound lane on E 7th Avenue between N 16th Street and N 15th Street will close at 8 am on January 15, 2022.

Eastbound and westbound traffic on E 7th Avenue between N 16th Street and N 15th Street will be intermittently maintained on the south side of E 7th Avenue during construction, with delays.

Sidewalks within the work area will be closed during construction.  Pedestrian access will be maintained via signage to other sidewalks in the area at all times during construction.

E 7th Avenue between N 21st Street/N 22nd Street and Nick Nuccio Parkway will reopen to traffic by 2 pm on Saturday, January 15, 2022, weather permitting.    

The City of Tampa recommends that motorists use alternate routes to avoid traffic congestion.

A high-resolution map with the City of Tampa’s suggested alternate routes can be found embedded below.

ROW-22-0000095

See all road closures at www.tampa.gov/RoadClosures


For additional information, please contact:
Debbie Herrington, P.E., Transportation ROW Engineer

City of Tampa Mobility Department
(813) 274-3104; debbie.herrington@tampagov.net

Road Closure January 11th