A portion of N Franklin Street between E Polk Street and E Zack Street will close daily from 9 am to 4 pm beginning on Monday, December 28, 2020 for utility construction. A utility contractor will be installing electrical lines for a small wireless facility on the west side of N Franklin Street between E Polk Street and E Zack Street. The southbound lane on N Franklin Street between E Polk Street and E Zack Street closed at 9 am beginning on December 28, 2020.
The sidewalk in the construction area will be closed. Pedestrians will be detoured to other sidewalks in the area via signage.
All lanes on N Franklin Street between E Polk Street and E Zack Street will reopen by 4 pm on Friday, January 22, 2021, weather permitting.
The City of Tampa recommends that motorists use alternate routes to avoid congestion.
CPP-21-0000019
For additional information, please contact:
Debbie Herrington, P.E., Transportation ROW Engineer
City of Tampa Mobility Department
(813) 274-3104; debbie.herrington@tampagov.net