A portion of W Tampa Bay Boulevard between Air Cargo Road and N Lois Avenue will close daily between 9 am and 4 pm beginning on Monday, February 10, 2020 for road construction.
A portion of N Howard Avenue between W Main Street and W Columbus Drive will close daily between 9 am and 4 pm beginning on Monday, February 10, 2020 for driveway and sidewalk construction. A private contractor will be installing driveway apron and a sidewalk on the east side of N Howard Avenue
A portion of W Cass Street between N Boulevard and N Howard Avenue and N Willow Avenue between W Kennedy Boulevard and W Cypress Street will close beginning on Tuesday, February 11, 2020, as part of the Cypress Street Outfall Regional Stormwater Improvements Design-Build project.
Starting at 9am on February 11, portions of the north and southbound lanes on South MacDill Avenue between W Horatio Street and W DeLeon Street will close while department crews repair a sewer lateral.
A portion of S Beneficial Drive between Knights Run Avenue to Channelside Drive will close daily between 9 am and 4 pm beginning on Monday, February 10, 2020 for utility construction. A utility contractor will be installing communication cables on the east side of S Ben
A portion of W Gandy Boulevard between Bayshore Boulevard and S MacDill Avenue will close daily from 9 am to 4 pm beginning on Monday, February 10, 2020. A utility contractor will be installing aerial and underground communication cables on the north side of W Gandy Boulevard between Baysh
Traffic is expected to be heavier than normal this Saturday around the Curtis Hixon Waterfront Park. Drivers and pedestrians alike are advised to allow for extra travel time and travel through the area with caution.
A portion of S MacDill Avenue between W Bay to Bay Boulevard and W El Prado Boulevard will close daily from 9 am to 4 pm beginning on Monday, February 10, 2020 for utility maintenance. A TECO contractor will be replacing a transmission pole at the northeast corner of S MacDill Avenue and W
A portion of E Osborne Avenue between N 22nd Street and N Nebraska Avenue will close at 9 am beginning on Monday, February 10, 2020 for utility construction. A TECO contractor will be installing electric conduit, pole, and streetlights on the north side of E Osborne Avenue bet
Traffic is expected to be heavier than normal this Saturday around the Julian B. Lane Riverfront Park. Drivers and pedestrians alike are advised to allow for extra travel time and travel through the area with caution.