Jose Gaspar Ship

Recertification for Stormwater Utility Mitigation Credit

Indicates required field

View the PDF for this form. Questions? Call (813) 274-8386

Section A - Owner Information


name
address

Section B: Property Information


Folio
nameofproperty
Site Address

Section C- Current Mitigation to Certify


Eligibility
Note: For parcels discharging to eligible non-City Stormwater System; The survey or site plan must depict the area of the parcel directly discharging to eligible waters and shall also display any additional area that is discharging to the City's system or other receiving water bodies.
Eligibility
Eligibility
Eligibility

Section D - Documentation


Adequate documentation such as As-builts or inspection reports must be submitted to demonstrate the infrastructure is functioning as designed and is still
eligible to receive the mitigation credit. Please refer to City Code Section 21-123 and the City’s Mitigation Policy for required documentation and note that
the City reserves the right to request additional information if necessary. 

Section E - Certification Statements


Sign below certifying that you have read the following statements and understand each one:

  • The information in this application is truthful and accurate.
  • I hereby grant the City of Tampa staff access to the property referenced in this document to inspect the facility or facilities for mitigation
    credit qualification. City shall provide at least twenty-four (24) hours notice to property owner. 
  • I will notify the City of Tampa should any alteration occur to the facility referenced in this certification that prevents it from performing
    as credited. 
  • The stormwater management system identified herein is in compliance with the site plan, regulatory requirements and assigned mitigation
    requirements. 

If approved, all non-residential properties are required to submit to the City a recertification application and supporting documentation every 5th year after receiving a mitigation credit; attesting the on-site stormwater infrastructure which qualified the property to be eligible for the mitigation credit continues to exist and is maintained to be functioning as designed.  I understand if the recertification is granted, the deadline for the next recertification will be on the approval letter and it is my responsibility to adhere to it. I understand there is no other notification.

Sign in Gray Box Above

For multiple owners, representative responsible for management may sign

Section F - Engineer's Signature & Seal


Sign in Gray Box Above
Maximum 10 files.
7 MB limit.
Allowed types: txt, rtf, pdf, doc, docx, odt, ppt, pptx, odp, xls, xlsx, ods.
80 MB limit per form.
Maximum 5 files.
7 MB limit.
Allowed types: gif, jpg, jpeg, png.
80 MB limit per form.