Ybor City

Lamb Canal Rehabilitation & Flood Relief

Primary Details

Description
The Lamb Canal has experienced long‑term erosion and embankment deterioration, reducing capacity and increasing the risk of further damage to adjacent properties. This project will rehabilitate the canal by removing accumulated sediment, stabilizing eroded banks, and improving conveyance within the canal and its connecting ditches. Additional upgrades will enhance embankment stability and overall drainage performance throughout the watershed. A future phase may include replacing and upsizing the drainage pipes at W. Bay to Bay Boulevard and S. Manhattan Avenue to alleviate frequent nuisance flooding at that intersection.

The project is currently at a 60% design status. Upon completion, the project will relieve flooding along local and collector roadways thereby improving traffic safety, and water quality draining to Lake Dundee and Tampa Bay, as well as provide for a low-maintenance and resilient drainage system.

Community Benefits
Flooding Relief | Erosion Protection

Contact Info

Contact Name
Alex Awad
Contact Phone
813-380-6114
Project ID
1001171
Department ID
SW50006
Project Type
Status
Project Phase
Construction Fiscal Year
2028
Multi Year Project
Yes
Council District
4
Neighborhood

Schedule and Costs

Project Phase
Planning
Design
Procurement
Construction
Closeout
Current Phase: Planning
Planned Start Date
Planned End Date
Funding Source
Stormwater Improvement Fee
Estimated Cost
$6,800,000
Funded Project
Yes
Location

27.917513304781, -82.522533807684