In the Design Phase, the project design is being completed and funding sources are identified.
26
Projects
30% Design Completion
W Cypress Street Resurfacing (Zone 2) from N Himes Ave to North Blvd
Resurfacing and Pedestrian Accessibility Improvements
W Cypress Street Resurfacing (Zone 1) From N Obrien St to N Himes Ave
Resurfacing and Pedestrian Accessibility Improvements
Twiggs St (Ashley Dr to Nebraska Ave)
Complete Street
N Boulevard Resurfacing from W Green St to W Dr MLK Blvd
Resurfacing and Pedestrian Accessibility Improvements
N 34th Street ADA Improvements from 29th Ave to 33rd Ave
This project will provide updated pedestrian curb ramps to…
MacDill Air Force Base Access Improvements (Interbay Blvd between West Shore Blvd and S. Bayshore Blvd)
Complete Streets & Safety Improvements
Lois Ave (Cleveland St to Boy Scout Blvd)
Complete Streets & Safety Improvements
InVision Streetcar (Design Only)
Transit
Hanna Avenue Phase 1 (24th St to CSX RR)
Complete Street
Doyle Carlton Dr & Laurel St Intersection Improvements
• Walking and biking accommodations to support all users…
Manhattan Ave & Bay to Bay Blvd - Traffic Signal Upgrade
Enhances safety to all modes of transportation at the…
60% Design Completion
S Macdill Ave Resurfacing from W Gandy Blvd to W Bay to Bay Blvd
Resurfacing and Pedestrian Accessibility Improvements
N 24th Street (Hanna Ave to Sligh Ave)
Complete Streets & Safety Improvements
MacDill Ave & Gandy Blvd - Traffic Signal Upgrade
Enhances safety to all modes of transportation at the…
Himes Ave & Gandy Blvd - Traffic Signal Upgrade
Enhances safety to all modes of transportation at the…
Drew Park CRA - Mobility, Connectivity, and Safety Improvements
Projects to include but limited to: areas to close sidewalk…
Downtown Core Complete Streets (Tampa St from Brorein St to Jackson St)
Complete Streets & Safety Improvements
Downtown Core Complete Streets (Florida Ave from Channelside Dr to Jackson St)
Complete Streets & Safety Improvements
30th St (E Bougainvillea Ave to E Fowler Ave) Segment 2 (Resurfacing)
Complete Streets & Safety Improvements
90% Design Completion
Hanna Avenue Phase II (22nd St to 30th St)
Complete Street
Franklin St and Fort Brooke Garage - Blank Out Signs
Safety Enhancement
Cass St Bridge (#105502) Electrical/Mechanical Rehabilitation
Bridges & Seawalls
Brorein St Bridge (#105501) Phase 2 Mechanical/ Electrical Rehabilitation
Bridges & Seawalls
Brorein St Bridge (#105501) Phase 1 Structural Rehabilitation
Bridges & Seawalls
30th St Sligh Intersection Improvements
Complete Streets & Safety Improvements