Ybor PS FM Rehabilitation

Primary Details

Description
This project provides for the rehabilitation of the force main that serves the Ybor Pumping Station located at 1302 N 25th St. The scope includes approximately 1,090 feet of 72” force main along 26th Street, which will be rehabilitated or replaced due to its deteriorated condition. As a part of this project, a new 36” force main will be constructed from the Ybor Station to the intersection of 34th street and 3rd avenue to function as a temporary bypass to divert the normal high flows from the Ybor Pump Station during the replacement of the existing 72”. The 36” FM will be left available long after the project is complete, providing more flexibility and resiliency for future challenges.
Community Benefits
The force main replacement project will replace aging, deteriorated pipelines that have reached the end of their useful life and are susceptible to failure that can cause wastewater overflows that impact public health, safety, and the environment. The new force main will provide additional capacity for future development and lower energy costs of public and private pumping stations. The addition of the new force main provides added operational flexibility and resiliency to better serve the community during future maintenance activities and high flow conditions.

Contact Info

Contact Name
Charlie Lynch
Contact Phone
8132748916
Project ID
1002941
Department ID
WW1002941
Project Type
Project Phase
Construction Fiscal Year
2028
Multi Year Project
No
Council District
5

Schedule and Costs

Project Phase
Planning
Design
Procurement
Construction
Closeout
Current Phase: Design
Planned Start Date
Planned End Date
Funding Source
PIPES
Estimated Cost
$6,898,000
Funded Project
Yes
Contract Number
26-D-00030
Location

27.958742817623, -82.426574806216

Project Location