TRAFFIC ADVISORY — Utility Repair Work
On October 3, 2024, a contractor for the Wastewater Department will be performing a sanitary sewer repair on an existing main line that will temporarily close W. Rogers Avenue, between S. Dale Mabry Hwy and S. Grady Avenue. Signage and traffic control devices will be posted to assist with rerouting traffic. Traffic will resume normal flow once past the work site. Access will be maintained for residents in the area. Motorists are advised to consider alternate routes and use caution when driving in the area.
The work and final restoration are scheduled to be completed on October 8, 2024. Normal traffic patterns will then resume. Work schedules are contingent upon weather conditions. See all road closures at www.tampagov.net/RoadClosures
Roads Affected: W Rogers Avenue (between S Dale Mabry Hwy & S Grady Ave)
Dates: October 3, 2024, to October 8, 2024
Time: Continuous
Closure Type: Temporary Road Closure
Permit: CWS-24-0000861
Contact: Albert Calloway, Construction Engineer
City of Tampa Contract Administration / Construction Engineering & Inspections
(813) 635-3400, Albert.Calloway@tampagov.net
See road closures at https://www.tampa.gov/roadclosures
See capital projects at https://www.tampa.gov/projects
See active permits at https://www.tampa.gov/permits