TRAFFIC ADVISORY  Water Utility Installation

Roads Affected: S. MacDill Avenue at W. Sunset Drive

Construction period: March 13, 2024

Time: 7:00 AM to 5:00 PM

 

TRAFFIC ADVISORY  Utility Construction

Roads Affected: S. MacDill Ave. between W. Watrous Ave. and W. Sunset Dr.

Dates: March 13th, 2024

Time: Daily 7 am - 5 pm

Closure Type: Temporary lane closure. The northbound outside lane will be closed at W. Sunset Dr. while a Water Department Contractor installs a waterline connection.

Permit: CWS-22-0000180

 

For additional information, please contact:
Albert Calloway, Construction Engineer
City of Tampa Construction Administration Department
(813) 635-3400