TRAFFIC ADVISORY -- Road Maintenance
Roads Affected: Channelside Dr (S Nebraska Ave - Water St)
Dates:
February 6, 2024 – February 10, 2024 – Phase 1
February 10, 2024 – February 14, 2024 – Phase 2
TRAFFIC ADVISORY -- Road Maintenance
Roads Affected: Channelside Dr (S Nebraska Ave - Water St)
Dates:
February 6, 2024 – February 10, 2024 – Phase 1
February 10, 2024 – February 14, 2024 – Phase 2
TRAFFIC ADVISORY -- Building Construction
Roads Affected: W Bay to Bay Blvd (S Grady Ave - S Clark Ave)
Dates: February 5, 2024 to February 9, 2024
Time: 9am-4pm
Beginning at 9 am today (01/31/2024), the outside northbound lane on South Plant Avenue will be closed between West Beach Place and West Hyde Park Place while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow.
TRAFFIC ADVISORY -- Utility Construction
Roads Affected: W Linebaugh Ave (N Armenia Ave - N Willow Ave)
Dates: February 5, 2024– May 5, 2024
Time: Daily (9 am – 4 pm)
Beginning at 9 am today (01/30/2024), North 22nd Street will be closed between East 18th Avenue and East 19th Avenue while the Tampa Water Department conducts maintenance on the water distribution system.
Beginning at 9am today (01/30/2024), North 15th Street will be closed between East Genesee Street and East North Bay Street while the Tampa Water Department conducts maintenance on the water distribution system.
Beginning at noon today, North Boulevard will be closed between West Seneca Avenue and West Bougainvillea Avenue while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow. Please use caution when driving in the area.
Beginning at 9am today, the outside northbound lane on South 50th Street between South 24th and South 27th Avenues will be closed while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with rerouting and traffic flow.
TRAFFIC ADVISORY – Railroad Track Removal
Roadways Affected: E Twiggs St (N Nebraska Ave – N Meridian Ave)
Dates: February 2, 2024 to February 5, 2024
Time: 24 hours