Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
Commerce Palms Dr and Compton Dr Transportation P5: Closeout Closeout 7 $425000.00 2026 Other Agencies This project is for the design and construction of a new traffic signal at the intersection of Commerce Palms Dr and Compton Dr. The project will also include new crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. Due to the land development in the area, the City of Tampa was provided with $425,000 to enhance safety and accessibility.
TCC Renovations Phase II Convention Center & Tourism P5: Closeout Closeout 5 $3983058.00 2021 Tourist Development Taxes

This project provides for multi-year renovations at the Tampa Convention Center including but not limited to restroom, elevator, & meeting room upgrades, air handlers & chillers, painting, and other.

Convention Center Renovations Convention Center & Tourism P5: Closeout Closeout 5 $38134770.53 2021 Tourist Development Taxes

This project provides for multi-year renovations at the Tampa Convention Center including but not limited to restroom, elevator, & meeting room upgrades, air handler & door replacement, painting, and other improvements as needed.

30th St (E Busch Blvd to E Bougainvillea Ave) Segment 1 (Resurfacing) Transportation P5: Closeout Closeout 7 $3334945.60 2024 Local Option Gas Tax This project provides for complete street roadway improvements to enhance safety and multimodal connectivity, including sidewalks and trails, bicycle facilities, enhanced crosswalks, and other safety measures. Landscaping and green infrastructure components are also included.
122nd Ave Pumping Station Rehabilitation Wastewater P5: Closeout Closeout $1260000.00 2025 PIPES This project provides for the rehabilitation of 122nd Avenue wastewater pumping station located at 2715 E 122nd Ave. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure the continued reliability of the station.
Willow Ave WM Replacement Water P2: Design 30% Design Completion 5 $7888229.34 2028 PIPES Approximately 17,373 linear feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
Glen Ave Sidewalk and Safety Improvements (Green St to Beach St) Transportation P5: Closeout Closeout 6 $1672823.61 2025 Multiple Funding This project provides for drainage improvements and sidewalk construction.
Woodmere & Lois Stormwater Engineering P2: Design 90% Design Completion 6 $150000.00 2027 Stormwater Improvement Fee Lois Ave and Dale Ave southeast of Woodmere Rd experience flooding due to insufficient drainage capacity. The proposed project consists of construction of new pipes and inlets connecting on Lois Ave and Dale Ave to alleviate the flooding.
Salcines Park Improvements Parks & Recreation P4: Construction Construction in Progress 5 $1267798.68 2025 Community Redevelopment Agency Improvements to Salcines Park based on public input.
S.E. Seminole Heights Flooding Relief (GMP 1) Stormwater Engineering P4: Construction Construction in Progress 6 $30000000.00 2022 Stormwater Improvement Fee Design and construction of approximately 16,300 LF of stormwater culverts with associated laterals, inlets, interconnections to existing stormwater system, associated utility conflict resolution relocations, transportation elements, water main replacement upgrades and sustainability treatment elements. The project will also include certain transportation elements as well as the replacement of approximately 11,700 LF of water mains not in the same corridors as the proposed stormwater infrastructure
DLTWTF Master Plan Task Order 013 Filter Improvements Water P4: Construction Construction in Progress 5 $119121495.00 2024 PIPES The DLTWTF Master Plan Filter Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Downtown Core Complete Streets (Brorein St from Ashley Dr to Morgan St) Transportation P5: Closeout Closeout 5 $1900000.00 2025 Local Option Gas Tax This project provides for multimodal and safety improvements. General maintenance and Complete Streets improvements to several streets and incorporated in this project in the Downtown Core: Brorein St from Ashley Dr to Morgan St. As part of the project, these roadways will be resurfaced to remove deficiencies and provide a newly finished driving surface. This project will also include multimodal improvements to make these corridors safer for all users in accordance with the City’s Vision Zero initiative. • Parking Protected Buffered Bike Lanes with conflict markings to allow for safer cycling; • Pedestrian Bulb-outs to shorten pedestrian crossing distances; • Enhanced Crosswalks to provide pedestrians with more visibility; • Traffic Calming features to control speeds and reduce the likelihood of fatal crashes; • Reconstructed Curb Ramps to provide ease of use and accessibility to people with disabilities.
DLTWTF MP Task Order 008 Raw Water Pump Station Water P2: Design 90% Design Completion 5 $73814773.00 2027 PIPES The DLTWTF Master Plan Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
W Cypress Street Resurfacing (Zone 1) From N Obrien St to N Himes Ave Transportation P2: Design 30% Design Completion 6 $6035773.00 TBD Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 1.9 miles from N Obrien st to N Himes Ave. This section of W Cypress is a collector roadway serving as a critical access route for the Tampa International Airport, Carver City Lincoln Gardens, North Bon Air, Midtown and Oakford Park neighborhoods. The project will include:
• Roadway resurfacing
• Improved pavement markings
• ADA pedestrian ramps
Armory Gardens Water P3: Procurement Project Startup 6 $1156019.80 2027 PIPES Approximately 4,136 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Peter O Knight Project Water P3: Procurement Consultant/Contractor Selection Process 4 $960089.00 2027 PIPES Approximately 3,218 linear feet of water mains ranging from 12 to 16 inches in diameter will be replaced.
Beach Park Drainage Improvements Stormwater Engineering P5: Closeout Closeout 6 $1000000.00 2022 Stormwater Improvement Fee

This project provides for the construction of new pipes and inlets connecting to the existing system on Swann Avenue to alleviate flooding in the area.

DLT Master Plan DB Task Order 010 Ozone Improvements Water P2: Design 90% Design Completion 5 $57700738.00 2026 PIPES The DLTWTF Master Plan Ozone Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Hanna Avenue Phase 1 (24th St to CSX RR) Transportation P2: Design 30% Design Completion 5 $1670096.00 2030 Yet to be Determined Reprofiling of Hanna Avenue in front of City Center
30th St and Fowler - USF FM Extension Wastewater P4: Construction Construction in Progress 7 $2500000.00 2025 PIPES Replace and extend the existing 12” USF force main on 30th St. south of Fowler Ave. to north of 109th Ave with 2,150 LF of 18” PVC force main.
High Service Pump Station (GMP 2) Water P5: Closeout Closeout 5 $65985127.00 2021 PIPES The High Service Pump Station project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Training Burn Simulator and Skills Tower Fire P5: Closeout Closeout 5 $2571898.00 2023 Tax - Other

This project provides for the construction of a burn simulator for firefighting. The remediation of the firefighter skills tower is required for continued training for current and recruits training.

Sitewide Electrical Improvement Water P4: Construction Final Contract Review & Approval 5 $52935137.00 2026 PIPES The TECO House and Sitewide Electric project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Church Pumping Station Rehabilitation (Year 3) Wastewater P2: Design 30% Design Completion 4 $1200000.00 2027 PIPES The project provides for the rehabilitation of the wastewater pumping station at 3901 Elmwood Terr. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure continued reliability of the station.
Lower Peninsula Water P5: Closeout Closeout 4 $1655134.57 2023 PIPES The Lower Peninsula project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 3,638 Linear Feet of water mains ranging from 2 to 16 inches in diameter will be replaced and upgraded.