Displaying 151 - 175 of 208
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
43rd St Ditch Rehabilitation Stormwater Engineering P4: Construction Construction in Progress 5 $2280000.00 2025 Stormwater Improvement Fee Project area is located just west of the Tampa Distribution Center located at 1212 N. 50th Street as in identified as the 43rd Street Drainage Improvements because of the nearest downstream crossing. Work involves approximately 700 feet of concrete slope stabilization of an existing ditch and all miscellaneous and appurtenant work.
MLK Resurfacing from Air Cargo to Dale Mabry Transportation P4: Construction Construction in Progress 6 $950000.00 2026 Local Option Gas Tax Pavement resurfacing
Branch PS Collection System CIPP Lining Wastewater P5: Closeout Closeout 6 $1999350.00 2025 PIPES This project includes the rehabilitation of approximately 15,087 linear feet of 8-inch to 21-inch diameter gravity sewers and the rehabilitation of 45 manholes.
Franklin St and Fort Brooke Garage - Blank Out Signs Transportation P2: Design 90% Design Completion 5 $72000.00 2026 Yet to be Determined This project will provide the in-house design of a new blank out signs in the median at Franklin Street and the Foot Brooke garage for enhanced safety for motorists and the streetcar.
W Cypress Street Resurfacing (Zone 2) from N Himes Ave to North Blvd Transportation P2: Design 30% Design Completion 5 $3740451.00 TBD Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 2.0 miles from N Himes Ave to North Blvd. This section of W Cypress is a collector roadway serving as a critical access route for the Midtown, Oakford Park, Armory Gardens, North Hyde Park and West Riverfront neighborhoods. The project will include:
• Roadway resurfacing
• Improved pavement markings
• ADA pedestrian ramps
MacDill Ave & Gandy Blvd - Traffic Signal Upgrade Transportation P2: Design 60% Design Completion 4 $900000.00 2027 Other Agencies This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
North Ybor Phase I Water P2: Design 60% Design Completion 5 $3435469.56 2028 PIPES Approximately 9,604 linear feet of water mains ranging from 2 to 12 inches in diameter will be replaced.
Tampa Heights WM Replacement Phase III Water P2: Design 30% Design Completion 5 $1843418.60 2028 PIPES Approximately 5,146 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Foundation for Tampa's Neighborhoods Project_Forest Hills Area Water P5: Closeout Closeout 7 $5454315.43 2022 PIPES

The Foundation for Tampa’s Neighborhoods Project_Forest Hills Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 66,070 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.

Foundation for Tampa’s Neighborhoods Project_East Tampa Area Water P5: Closeout Closeout 5 $9594286.67 2022 PIPES The Foundation for Tampa’s Neighborhoods Project_East Tampa Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 35,271 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
DLTWTF Building Improvements Water P5: Closeout Closeout 5 $3160168.00 2021 PIPES

The DLTWTF Building Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.

NTCB Elmer Pond Expansion Stormwater Engineering P2: Design 30% Design Completion 7 $90000.00 2027 Stormwater Improvement Fee Property acquisition and pond expansion
17TH and Annona Stormwater Engineering P3: Procurement Contract Negotiations 7 $300000.00 2026 Stormwater Improvement Fee Construction of new inlets and pipes connecting to the existing system
Adalee Pumping Station Rehabilitation Wastewater P5: Closeout Closeout 5 $1046500.00 2025 PIPES The project provides for the rehabilitation of the wastewater pumping station at 3105 N Avon Ave. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure continued reliability of the station.
Sidewalks- 9th St (Bougainvillea Ave to Linebaugh Ave) Transportation P5: Closeout Closeout 5 $85000.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Sidewalks- Fern St (N 9th St to N 12th St) Transportation P5: Closeout Closeout 6 $80000.00 2024 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Sidewalks- Fig St (Hubert Ave to Lois Ave) Transportation P5: Closeout Closeout 6 $145000.00 2024 Transportation Impact Fees This project will provide safety and multimodal improvements though the addition of new 5 ft-wide sidewalk on one side of the street and an improved version of the existing sidewalk on the other side. Pedestrian access to Charles B. Williams Park will be improved and the project will assist in completing the micro-mobility network.
Sidewalks- Bay to Bay Blvd (MacDill Ave to Ysabella Ave) Transportation P5: Closeout Closeout 4 $156800.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

DLTWTF MP Task Order 007 Deep Well Injection Water P2: Design 60% Design Completion 5 $57706.00 2028 PIPES The DLTWTF Master Plan Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
FY20 CIP Water Main Improvements Design-Build_JFK Blvd - GMP 2 Water P5: Closeout Closeout 4 $5012756.50 2022 PIPES Amendment 2 (aka GMP 4) to the FY20 CIP Water Main Improvements Design-Build Project_JFK Blvd project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 18,550 Linear Feet of water mains ranging from 6 to 16 inches in diameter will be replaced and upgraded.
East/West Columbus Drive Water P5: Closeout Closeout 5 $1438509.21 2023 PIPES

The East/West Columbus Drive project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 4,800 Linear Feet of water mains ranging from 8 to 12 inches in diameter will be replaced and upgraded.

FY20 CIP Water Main Improvements Design-Build_W Riverside Heights – GMP 5 Water P5: Closeout Closeout 6 $4912885.00 2026 PIPES The W Riverside Heights Project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 9,747 Linear Feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Jefferson Water P3: Procurement Project Startup 5 $2557136.76 2027 PIPES The Jefferson project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 7,479 Linear Feet of water mains ranging from 6 to 8 inches in diameter will be replaced and upgraded.
Downtown Phase II Collection System Rehabilitation Wastewater P5: Closeout Closeout 5 $1600000.00 2023 PIPES This project includes the rehabilitation of approximately 34,476 linear feet of 8-inch to 24-inch diameter gravity sewers and the rehabilitation of 480 manholes.
Westshore Boulevard Gravity Sewer Rehabilitation of CIPP Lining - Gandy Boulevard to Cleveland Street Wastewater P5: Closeout Closeout 6 $1130000.00 2024 PIPES This project includes the rehabilitation of approximately 11,444 linear feet of 8-inch to 18-inch diameter gravity sewers and the rehabilitation of 19 manholes.