Ballast Point Pier Sunrise

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 126 - 150 of 208
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
Louisiana Ave Water Pipe Replacement Water P2: Design 60% Design Completion 5 $230346.81 2027 PIPES Approximately 679 linear feet of 2 inch diameter water main will be replaced and upgraded.
Foundation for Tampa’s Neighborhoods Project_Virginia Park Area Water P5: Closeout Closeout 4 $8677855.56 2022 PIPES

The Foundation for Tampa’s Neighborhoods Project_Virginia Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 40,333 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.

Yorkshire Water P5: Closeout Closeout $8709704.34 2024 PIPES The Yorkshire project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 25,730 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
NTCB 99th Ave East -Pond Expansion Stormwater Engineering P5: Closeout Closeout 7 $100000.00 2024 Stormwater Improvement Fee

Property acquisition and pond expansion

Harbour Island Force Main Replacement Wastewater P5: Closeout Closeout 5 $83042970.00 2021 PIPES This project provides for the replacement of the force main located on Harbour Island that serves the Krause pumping station. Proposed 1,300 LF of 12" FM, 1,000 LF of 48" FM and 7,800 of 54" FM Replacement. FM route starts at the WW treatment plant at the Port and connects to the existing FM at Franklin south of Platt.
Sidewalks- Old Seminole Heights (E Park Cir, Hilton Pl, & E Broad St) Transportation P5: Closeout Closeout 6 $190000.00 2024 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Sidewalks- Himes Ave (Bay to Bay Blvd to Empedrado St) Transportation P5: Closeout Closeout 4 $32000.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Sidewalks- Hubert St (W Cypress to W Main St) Transportation P5: Closeout Closeout 6 $320000.00 2025 Transportation Impact Fees This project provides for a new sidewalk 2,000 feet in length and 5 feet in width along both sides of N Hubert Ave, extending from W Cypress St to W Main St, as well as filling any sidewalk gaps within that range. These improvements will contribute to increased school and pedestrian safety, multimodal network connection, and increased access to the local Loretta Ingraham Recreation Complex.
Sidewalks- Prescott St (S Kissimmee St to West Shore Blvd) Transportation P5: Closeout Closeout 4 $32000.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Tampa St and 7th Ave - Traffic Signal Transportation P5: Closeout Closeout 5 $500000.00 2023 Multiple Funding

This project provides for construction of a new traffic signal at the intersection of Tampa Street and 7th Avenue.

24th St. Corridor Improvements (Chelsea St. to Emma St.) Transportation P5: Closeout Closeout 5 $357560.00 2023 Local Option Gas Tax

This project provides for a new roadway connection in unimproved right of way.

Sidewalks- 12th St. Sidewalk for Sulphur Springs K-8 Transportation P5: Closeout Closeout 5 $35000.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Kirby St. FM Replacement Project Wastewater P5: Closeout Closeout $1565354.00 2024 PIPES Proposed 1100 LF of 14" FM on Kirby St and Proposed 900 LF of 8" FM on Egypt Lake Dr. Tie in existing Clearview FM with the Carlton Arms and Egypt Lake FM.
Gray Gables Water P2: Design 90% Design Completion 6 $4969604.29 2027 PIPES The Gray Gables project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also increase capacity to serve a growing population. Approximately 12,722 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
Rome Ave Pump Station Rehabilitation (Year 2) Wastewater P4: Construction Construction in Progress 6 $2167000.00 2026 PIPES This project provides for the complete rehabilitation of Rome Avenue Pumping Station at 4503 N Rome Ave. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
Sheridan Pumping Station Rehabilitation (Year 3) Wastewater P2: Design 30% Design Completion 4 $1200000.00 2027 PIPES The project provides for the rehabilitation of the wastewater pumping station at 6200 S Sheridan Rd. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure continued reliability of the station.
Ballast Point Pumping Station Rehabilitation Wastewater P5: Closeout Closeout 4 $1478200.00 2025 PIPES The project provides for the complete rehabilitation of Ballast Point Pumping Station at 3606 Ballast Point Blvd. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
Sulphur Springs K-8 Safe Routes to School Transportation P5: Closeout Cancelled 5 $495000.00 2024 Grants

This project provides for safety improvements, traffic calming, and pedestrian facilities to establish a safe walking route to school.

Mabel North of Henry Stormwater Engineering P4: Construction Construction in Progress 6 $90000.00 2025 Stormwater Improvement Fee Low-lying on Mabel St between Henry and Idlewild Ave experiences frequent flooding due to insufficient drainage capacity. The proposed project consists of construction of new pipes and inlets connecting to the existing drainage system to alleviate the flooding.
Rome Ave Pump Station Force Main Replacement Wastewater P4: Construction Construction in Progress 6 $1480000.00 2025 PIPES This project provides for the replacement of the force main that serves the Rome Ave pumping station. Proposed 1,000 LF of 12" FM replacement including a subaqueous crossing North of MLK Blvd between Rome and Riverside Dr.
Parkedge Pumping Station Rehabilitation (Year 2) Wastewater P4: Construction Construction in Progress 7 $1150000.00 2025 PIPES This project provides for the rehabilitation of Parkedge wastewater pumping station located at 8502 Parkedge Dr. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure the continued reliability of the station.
Riveredge Pumping Station Rehabilitation (Year 2) Wastewater P5: Closeout Closeout 7 $2140000.00 2025 PIPES This project provides for the rehabilitation of Riveredge wastewater pumping station located at 8801 Riveredge Dr. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure the continued reliability of the station. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
Hanna Avenue Municipal Building Renovations - Design Build Facility Management P5: Closeout Final Inspection and Testing 5 $101112026.00 2021 Tax - Other

Professional Design-Build services associated with the Hanna Avenue Municipal Building Renovations. The scope shall include, but not be limited to the following: Programming, Full design services, Renovation of existing building and site, Planning and coordination to assist the City in relocating three (3) City Departments to this facility at locations to be determined, Development of GMP for construction, Scheduling of all logistics.

NTCB 99th Ave -West Pond Expansion Stormwater Engineering P2: Design 30% Design Completion 7 $50000.00 2027 Stormwater Improvement Fee The project is part of the overall North Tampa Closed Basin Stormwater Improvements. The proposed project will expand the existing pond on the recently acquired properties adjacent to the existing pond to provide additional storage capacity for the area. The project includes property acquisition, pond construction, and pipe installation.
14th St (Av Republica De Cuba) & 21st Ave Transportation P5: Closeout Closeout 5 $353000.00 2025 Local Option Gas Tax This project is located at the intersection of N 14th St (ARDC) & E 21st Ave is to upgrade the existing concrete strain pole and span wire system using the galvanized steel pole and mast arm relocated from N Boulevard & W Ross Ave. The project will include new vehicular traffic signal heads along with new pedestrian signal heads and ADA compliant pedestrian ramps.