All Capital Improvement Projects
This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.
| Title | Project Type | Project Phase | Planned Start Date | Planned End Date | Status | Council District | Estimated Cost | Fiscal Year | Funding Source | Description |
|---|---|---|---|---|---|---|---|---|---|---|
| Busch Blvd Trunk Sewer Rehabilitation by CIPP Lining | Wastewater | P2: Design | 30% Design Completion | 7 | $1500000.00 | 2027 | PIPES | This project includes the rehabilitation of approximately 4,660 linear feet of 8-inch, 1,130 linear feet of 10-inch, 504 linear feet of 12-inch, 1,421 linear feet of 18-inch, 1,751 linear feet of 21-inch, 855 linear feet of 24-inch and 2,624 linear feet of 30-inch diameter gravity sewers. | ||
| Sulphur Springs PS FM Rehabilitation | Wastewater | P2: Design | 90% Design Completion | 5 | $6068935.00 | 2026 | PIPES | This project provides for the rehabilitation of the force main that serves the Sulphur Springs Pumping Station located at 7902 N 13th St. The scope includes approximately 24,500 linear feet of 42” and 48” force main extending to the force main discharge at E 29th Ave and N 26th St. As Part of this project the existing force main will be cleaned and rehabilitated to address significant clogging. The cleaning process will allow for a detailed inspection to assess overall condition of the force main. To maintain continuous service during cleaning, an abandoned force main in the vicinity will be reactivated and temporarily placed in service as a bypass to ensure the normal high flows from the PS are conveyed without interruption. The old force main will be left available long after the project is complete, providing more flexibility and resiliency for future challenges. | ||
| Warren Ave WM Replacement | Water | P2: Design | 30% Design Completion | 5 | $208152.11 | 2028 | PIPES | Approximately 581 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. | ||
| East Arbor Heights_West Phase I | Water | P2: Design | 60% Design Completion | 5 | $2432989.55 | 2027 | PIPES | Approximately 6,821 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded. | ||
| Tampa Heights WM Replacement Phase II | Water | P2: Design | 30% Design Completion | 5 | $1447393.74 | 2028 | PIPES | Approximately 3,572 linear feet of water mains ranging from 6 to 8 inches in diameter will be replaced. | ||
| Tampa Heights WM Replacement Phase I | Water | P2: Design | 30% Design Completion | 5 | $1536564.04 | 2028 | PIPES | Approximately 4,312 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. | ||
| East Arbor Heights_East Phase I | Water | P2: Design | 60% Design Completion | 5 | $9154599.74 | 2027 | PIPES | Approximately 26,964 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced. | ||
| Swann Ave WM Replacement | Water | P2: Design | 30% Design Completion | 4 | $4297504.96 | 2028 | PIPES | Approximately 11,386 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded. |
Was this page helpful? or
Thanks for letting us know!
Help us improve by leaving a quick comment
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.
- OR-
For a formal response complete the Page Enhancement Request form.