North Florida Avenue through Tampa

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 201 - 208 of 208
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
Busch Blvd Trunk Sewer Rehabilitation by CIPP Lining Wastewater P2: Design 30% Design Completion 7 $1500000.00 2027 PIPES This project includes the rehabilitation of approximately 4,660 linear feet of 8-inch, 1,130 linear feet of 10-inch, 504 linear feet of 12-inch, 1,421 linear feet of 18-inch, 1,751 linear feet of 21-inch, 855 linear feet of 24-inch and 2,624 linear feet of 30-inch diameter gravity sewers.
Sulphur Springs PS FM Rehabilitation Wastewater P2: Design 90% Design Completion 5 $6068935.00 2026 PIPES This project provides for the rehabilitation of the force main that serves the Sulphur Springs Pumping Station located at 7902 N 13th St. The scope includes approximately 24,500 linear feet of 42” and 48” force main extending to the force main discharge at E 29th Ave and N 26th St. As Part of this project the existing force main will be cleaned and rehabilitated to address significant clogging. The cleaning process will allow for a detailed inspection to assess overall condition of the force main. To maintain continuous service during cleaning, an abandoned force main in the vicinity will be reactivated and temporarily placed in service as a bypass to ensure the normal high flows from the PS are conveyed without interruption. The old force main will be left available long after the project is complete, providing more flexibility and resiliency for future challenges.
Warren Ave WM Replacement Water P2: Design 30% Design Completion 5 $208152.11 2028 PIPES Approximately 581 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
East Arbor Heights_West Phase I Water P2: Design 60% Design Completion 5 $2432989.55 2027 PIPES Approximately 6,821 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Tampa Heights WM Replacement Phase II Water P2: Design 30% Design Completion 5 $1447393.74 2028 PIPES Approximately 3,572 linear feet of water mains ranging from 6 to 8 inches in diameter will be replaced.
Tampa Heights WM Replacement Phase I Water P2: Design 30% Design Completion 5 $1536564.04 2028 PIPES Approximately 4,312 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
East Arbor Heights_East Phase I Water P2: Design 60% Design Completion 5 $9154599.74 2027 PIPES Approximately 26,964 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced.
Swann Ave WM Replacement Water P2: Design 30% Design Completion 4 $4297504.96 2028 PIPES Approximately 11,386 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.