Tampa Convention Center Skyline

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 1 - 25 of 96
Advanced options
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
Sulphur Springs Pumping Station Wastewater P2: Design 30% Design Completion 5 $19700000.00 2028 PIPES This project provides for the complete rehabilitation of Sulphur Springs Pumping Station at 7902 N. 13th St. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
Howard F. Curren AWTP Master Plan Improvements, Phase 2, Design-build GMP No. 1 Wastewater P3: Procurement Consultant/Contractor Selection Process 5 $31750000.00 2027 PIPES This project provides for the replacement of the High Purity Oxygen Generation System and related electrical and control systems; and the Sludge Control Building Electrical System including motor control centers, variable frequency drives and miscellaneous electrical components. The project will also include the improvement of the Howard F. Curren AWTP security, and the equipment purchase for the Main Switch Gear Facility replacement upcoming construction.
South Howard Water Improvement Project Water P2: Design 30% Design Completion 4 $4135485.57 2028 PIPES Approximately 7,955 linear feet of water mains ranging from 4 to 12 inches in diameter will be replaced and upgraded.
Bayshore Pumping Station Rehabilitation Wastewater P5: Closeout Closeout 4 $6400000.00 2025 PIPES This project provides for the complete rehabilitation of Bayshore Pumping Station at 3300 Bayshore Dr. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
D. L. Tippin Chemical System Improvements Water P4: Construction Construction in Progress 5 $41057978.00 2021 PIPES The Chemical System Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Armory Gardens Water P3: Procurement Project Startup 6 $1156019.80 2027 PIPES Approximately 4,136 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Morris Bridge Filter Roof Retro – COOP Site Water P5: Closeout Closeout 7 $3975099.00 2024 PIPES The City’s existing Morris Bridge Pump Station is situated on a 56.6 acre site in Tampa, Florida, near the intersection of Bruce B. Downs Boulevard and Interstate 75. Various facilities exist on the site, including the following: Filter building, Maintenance and storage buildings, Dewatering building, ground storage tanks, electrical gear, controls, main pump station electrical rooms, and abandoned facilities that formerly served as a lime softening WTF. This project will rehabilitate and replace existing infrastructure, such as the Filter Building roof, and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency.
Empedrado St Water P4: Construction Permitting/Submittals Approval 4 $790573.70 2026 PIPES Approximately 4,921 Linear Feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. The project area and the streets impacted by this project are shown on the attached map.
Hampton Terrace Project A Water P2: Design 90% Design Completion 6 $6312515.25 2026 PIPES Approximately 19,403 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
FY20 CIP Water Main Improvements Design-Build_W Chelsea St Transmission – GMP 5 Water P4: Construction Construction in Progress 6 $8053583.41 2026 PIPES The W Chelsea St Transmission project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 7,909 Linear Feet of water mains ranging from 6 to 24 inches in diameter will be replaced and upgraded.
Ybor PS FM Rehabilitation Wastewater P2: Design 30% Design Completion 5 $6898000.00 2028 PIPES This project provides for the rehabilitation of the force main that serves the Ybor Pumping Station located at 1302 N 25th St. The scope includes approximately 1,090 feet of 72” force main along 26th Street, which will be rehabilitated or replaced due to its deteriorated condition. As a part of this project, a new 36” force main will be constructed from the Ybor Station to the intersection of 34th street and 3rd avenue to function as a temporary bypass to divert the normal high flows from the Ybor Pump Station during the replacement of the existing 72”. The 36” FM will be left available long after the project is complete, providing more flexibility and resiliency for future challenges.
DLTWTF MP Task Order 007 Deep Well Injection Water P2: Design 60% Design Completion 5 $57706.00 2028 PIPES The DLTWTF Master Plan Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Palma Ceia Area 2 (AKA Phase III) Water P5: Closeout Closeout 4 $5893216.60 2021 PIPES The Palma Ceia Area 2 (AKA Phase III) project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 31,717 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded
Wastewater Pumping Station Rehabilitation 109th St. PS Wastewater P3: Procurement Permitting/Submittals Approval 7 $2201000.00 2026 PIPES This project provides for the complete rehabilitation of 109th Street Pumping Station at 10902 Marjory Ave. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
Jefferson Water P3: Procurement Project Startup 5 $2557136.76 2027 PIPES The Jefferson project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 7,479 Linear Feet of water mains ranging from 6 to 8 inches in diameter will be replaced and upgraded.
30th St and Fowler - USF FM Extension Wastewater P4: Construction Construction in Progress 7 $2500000.00 2025 PIPES Replace and extend the existing 12” USF force main on 30th St. south of Fowler Ave. to north of 109th Ave with 2,150 LF of 18” PVC force main.
Hampton Terrace Project B Water P2: Design 60% Design Completion 6 $6603637.59 2027 PIPES Approximately 19,843 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
DLTWTF Master Plan Task Order 013 Filter Improvements Water P4: Construction Construction in Progress 5 $119121495.00 2024 PIPES The DLTWTF Master Plan Filter Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Belmar Gardens Water P5: Closeout Closeout 4 $5581099.83 2022 PIPES The Belmar Gardens project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 21,205 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
Belmont Heights Gravity Sewer CIPP Lining Wastewater P4: Construction Construction in Progress 5 $7970000.00 2026 PIPES This project includes the rehabilitation of approximately 143,264 linear feet of 8-inch, 5,581 linear feet of 10-inch, 1,604 linear feet of 12-inch, 3,317 linear feet of 15-inch, and 3,744 linear feet of 18-inch diameter gravity sewers and the rehabilitation of manholes.
Sherwood Heights PS FM Relocation Wastewater P2: Design 90% Design Completion 7 $250000.00 2026 PIPES This project provides for the replacement of the force main that serves the Sherwood Heights Pumping Station. Proposed 2,350 feet of 8” force main on 26th St between 111th and 109th Avenues and 25th Street between 109th Avenue and Bougainvillea.
Lower Peninsula Water P5: Closeout Closeout 4 $1655134.57 2023 PIPES The Lower Peninsula project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 3,638 Linear Feet of water mains ranging from 2 to 16 inches in diameter will be replaced and upgraded.
Lois Ave Water P2: Design 90% Design Completion 6 $2093738.24 2027 PIPES Approximately 6,242 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
FY20 CIP Water Main Improvements Design-Build_12th St – GMP 5 Water P5: Closeout Closeout 5 $5596767.00 2026 PIPES Approximately 15,960 Linear Feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
122nd Ave Pumping Station Rehabilitation Wastewater P5: Closeout Closeout $1260000.00 2025 PIPES This project provides for the rehabilitation of 122nd Avenue wastewater pumping station located at 2715 E 122nd Ave. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure the continued reliability of the station.