Dates: April 28, 2022, to April 29, 2022
Time: Continuous road closure beginning at 9 am
Closure Type: Full Road Closure and Sidewalk Closure
Permit: ROW-22-0000139
Dates: April 28, 2022, to April 29, 2022
Time: Continuous road closure beginning at 9 am
Closure Type: Full Road Closure and Sidewalk Closure
Permit: ROW-22-0000139
Beginning at 9 am today, the outside southbound lane on South MacDill Ave will be closed between West Angeles St and West San Rafael St while the Tampa Water Department conducts maintenance on the water distribution system.
Beginning at 9 am today, the eastbound lanes on East Palm Ave will be closed between North Taliaferro Ave and North Mitchell Ave while the Tampa Water Department conducts maintenance on the water distribution system.
Beginning at 9am today, the outside westbound lane on West Cypress Street between North Hubert Avenue and North Lois Avenue will be closed while the Tampa Water Department conducts maintenance on the water distribution system.
Beginning at 9am today, the outside northbound lane on N Nebraska Avenue between E 121st Avenue and E 122nd Avenue will be closed while the Tampa Water Department conducts maintenance on the water distribution system.
Starting at 9am on April 26, department crews will close the westbound lane on W Euclid Ave between Bayshore Blvd and S Waverly Ct to begin repairs on a sewer lateral. Signage will be posted in the area to reroute traffic and assist with traffic flow.
Starting at 9am on April 26, department crews will close the outside eastbound lane on W El Prado Blvd between S Dale Mabry Hwy and S Church St to begin repairs on a sewer lateral. Westbound traffic will not be impacted.
Beginning at 9am today, the outside southbound lane on Henderson Blvd between S Hubert Ave and S Lois Ave will be closed while the Tampa Water Department returns to complete a more permanent restoration following earlier work on the water distribution system.
A portion of N 11th Street between E Whiting Street and E Kennedy Boulevard and E Washington Street between N Meridian Avenue and N 12th Street will close beginning on Wednesday, May 18, 2022 for road construction.
Starting at 9am on April 25, department crews will close the southbound lane of N Armenia Avenue between W North A St and W Cleveland St to begin repairs on a wastewater mainline pipe. Northbound traffic will not be impacted.