Temporary Lane Closure on W Azeele St to begin June 14, 2021 for Box Culvert Cleaning Project.

A portion of W Azeele Street between S Lois Avenue and S Hubert Avenue will close daily beginning on Monday June 14, 2021 for Box Culvert Cleaning.  A City contractor will be performing box culvert cleaning repairs.

June 8, 2021
Effective immediately - Temporary Lane Closures on East Busch Boulevard at the intersection of North 26th Street for Emergency Utility Maintenance Repair

Effective immediately, lane closures are in place on East Busch Boulevard at the intersection of 26th Street to replace a deteriorated manhole ring and cover.

The following lanes are closed:

June 8, 2021
Effective immediately – Temporary Lane Shifts on North Boulevard at the intersection of  W Plymouth Street for Emergency Utility Maintenance Repair

Effective immediately, northbound lane shifts are in place on North Boulevard at the intersection of W Plymouth Street for emergency repairs to a deteriorated section of gravity sewer pipe. Northbound traffic has been shifted to the center turn lane.

June 8, 2021
Lane Closure on North Boulevard Between West Main Street and West Green Street

Beginning at 9am today, the outside northbound lane on North Boulevard will close between West Main Street and West Green Street while the Tampa Water Department conducts scheduled maintenance on the water distribution system.

May 7, 2021
Update #1: Lane Closures on North Himes Avenue Between West Cherry Street and West Walnut Street

Beginning at 9am today, the southbound lanes of North Himes Avenue will be closed between West Cherry Street and West Walnut Street as the Tampa Water Department returns to complete a more permanent restoration following earlier work to repair a water main break.

April 5, 2021
Full Road Closure on North Rome Avenue between West River Shore Way  and West Erna Drive

All lanes of North Rome Avenue between West River Shore Way and West Erna Drive are closed as the Tampa Water Department works to perform repairs to the distribution system. Barricades and signs are in place to assist with traffic flow. Please use caution when driving in the area.

March 26, 2021
Lane Closure on South West Shore Boulevard Between West Longfellow and West Lamb Avenues

Beginning at 9am today, the northbound lane on South West Shore Boulevard will close between West Longfellow and West Lamb Avenues while the Tampa Water Department conducts scheduled maintenance on the water distribution system.

March 11, 2021
Update #1: Lane Closures on North Florida Avenue between East Henry Avenue and East Clifton Street

Beginning at 9am today, both northbound lanes of North Florida Avenue will be closed between East Henry Avenue and East Clifton Street while the Tampa Water Department returns to complete a more permanent restoration following earlier work to repair a water main break.

January 29, 2021
Road Closure on W. Gray Avenue from N. Fremont Avenue to N. Albany Avenue

Beginning at 9 am, Monday, February 1, 2021, W. Gray Street will be closed from N. Fremont Avenue to N. Albany Avenue as crews continue construction on the Cypress Street Outfall Regional Stormwater Improvements project.

January 14, 2021
NEW DATE - Howard Frankland Bridge Full Closure Saturday, January 16

All I-275 travel lanes on the Howard Frankland Bridge will close from 8 p.m. Saturday, January 16 to noon Sunday, January 17, weather permitting.