A portion of W Azeele Street between S Lois Avenue and S Hubert Avenue will close daily beginning on Monday June 14, 2021 for Box Culvert Cleaning. A City contractor will be performing box culvert cleaning repairs.
Road Closures
Effective immediately, lane closures are in place on East Busch Boulevard at the intersection of 26th Street to replace a deteriorated manhole ring and cover.
The following lanes are closed:
Effective immediately, northbound lane shifts are in place on North Boulevard at the intersection of W Plymouth Street for emergency repairs to a deteriorated section of gravity sewer pipe. Northbound traffic has been shifted to the center turn lane.
Beginning at 9am today, the outside northbound lane on North Boulevard will close between West Main Street and West Green Street while the Tampa Water Department conducts scheduled maintenance on the water distribution system.
Beginning at 9am today, the southbound lanes of North Himes Avenue will be closed between West Cherry Street and West Walnut Street as the Tampa Water Department returns to complete a more permanent restoration following earlier work to repair a water main break.
All lanes of North Rome Avenue between West River Shore Way and West Erna Drive are closed as the Tampa Water Department works to perform repairs to the distribution system. Barricades and signs are in place to assist with traffic flow. Please use caution when driving in the area.
Beginning at 9am today, the northbound lane on South West Shore Boulevard will close between West Longfellow and West Lamb Avenues while the Tampa Water Department conducts scheduled maintenance on the water distribution system.
Beginning at 9am today, both northbound lanes of North Florida Avenue will be closed between East Henry Avenue and East Clifton Street while the Tampa Water Department returns to complete a more permanent restoration following earlier work to repair a water main break.
Beginning at 9 am, Monday, February 1, 2021, W. Gray Street will be closed from N. Fremont Avenue to N. Albany Avenue as crews continue construction on the Cypress Street Outfall Regional Stormwater Improvements project.
All I-275 travel lanes on the Howard Frankland Bridge will close from 8 p.m. Saturday, January 16 to noon Sunday, January 17, weather permitting.
Road Closures & Transportation Advisories Sign Up
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.