Water taxi on Hillsborough River

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 101 - 125 of 208
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
30th St Sligh Intersection Improvements Transportation P2: Design 90% Design Completion 5 $281344.00 2027 Local Option Gas Tax This project provides for design and construction of capacity and multimodal improvements along the E Hanna Ave corridor from N 22nd St to N 30th Sr., along the 24th St from Hanna Ave to Sligh Ave, and at the intersection of Sligh Ave and 30th St. The project includes the following proposed improvements: 1. Hanna Avenue – 22nd Street to 30th Street: • Roadway milling and resurfacing. • Westbound Left Turn Lane into the new City Center at 2515 Hanna Ave. • Intersection improvements at the intersection of Hanna Ave at N 22nd St and Hanna Ave at N 30th St 2. 24th Street – Hanna Avenue to Sligh Avenue • Sidewalk along the west side of 24th St • All Way Stop Signs at “T” intersection along 24th St 3. Intersection at the Sligh Avenue and 30th Street • New Traffic Signal • Northbound Left-Turn Lane.
Hanna Avenue Phase 1 (24th St to CSX RR) Transportation P2: Design 30% Design Completion 5 $1670096.00 2030 Yet to be Determined Reprofiling of Hanna Avenue in front of City Center
30th St and Fowler - USF FM Extension Wastewater P4: Construction Construction in Progress 7 $2500000.00 2025 PIPES Replace and extend the existing 12” USF force main on 30th St. south of Fowler Ave. to north of 109th Ave with 2,150 LF of 18” PVC force main.
W Cypress Street Resurfacing (Zone 1) From N Obrien St to N Himes Ave Transportation P2: Design 30% Design Completion 6 $6035773.00 TBD Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 1.9 miles from N Obrien st to N Himes Ave. This section of W Cypress is a collector roadway serving as a critical access route for the Tampa International Airport, Carver City Lincoln Gardens, North Bon Air, Midtown and Oakford Park neighborhoods. The project will include:
• Roadway resurfacing
• Improved pavement markings
• ADA pedestrian ramps
Ola Ave Water P2: Design 60% Design Completion 5 $14930249.41 2028 PIPES Approximately 23,337 linear feet of water mains ranging from 2 to 24 inches in diameter will be replaced and upgraded.
Lantana-Poinsettia Pump Station Stormwater Engineering P2: Design 90% Design Completion 5 $200000.00 2027 Stormwater Improvement Fee This project provides for property acquisition and construction of a new collection system and new pump station to replace the temporary pump and force main connecting the existing drainage system on North 11th Street.
Okara Rd and 26th Street FM Stormwater Engineering P5: Closeout Closeout 7 $50000.00 2022 Stormwater Improvement Fee

The proposed project will replace the existing force main system for the pond located at Okara Road and 26th Street .

Tampa St and 7th Ave - Traffic Signal Transportation P5: Closeout Closeout 5 $500000.00 2023 Multiple Funding

This project provides for construction of a new traffic signal at the intersection of Tampa Street and 7th Avenue.

Sidewalks- 12th St. Sidewalk for Sulphur Springs K-8 Transportation P5: Closeout Closeout 5 $35000.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

FY20 CIP Water Main Improvements Design-Build_12th St – GMP 5 Water P5: Closeout Closeout 5 $5596767.00 2026 PIPES Approximately 15,960 Linear Feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
North Ashley Pond Expansion Stormwater Engineering P4: Construction Project Startup 7 $75000.00 2025 Stormwater Improvement Fee Currently there is substantial flooding on N Tampa St east of the existing Ashley stormwater pond. The project consists of the expansion of the existing stormwater pond to alleviate flooding in the neighborhood
Downtown Interchange Wastewater Collection System Rehabilitation by CIPP Lining Wastewater P5: Closeout Closeout 5 $600000.00 2023 PIPES This project includes the rehabilitation of approximately 9,844 linear feet of 8-inch and 10-inch diameter gravity sewers and the rehabilitation of 46 manholes.
Waters Ave Gravity Sewer Rehabilitation Wastewater P4: Construction Construction in Progress 6 $1382767.00 2023 PIPES This project includes the rehabilitation of approximately 12,566 linear feet of 8-inch to 30-inch diameter gravity sewers and the rehabilitation of 18 manholes.
Howard F. Curren AWTP Master Plan Improvements, Phase 1, Design-build GMP No. 4 Wastewater P4: Construction Construction in Progress 5 $115000000.00 2025 PIPES This project provides for Sludge Digestion System improvements at the Howard F. Curren AWTP. The project will include construction of two (2) 2.4M gallon gas holding anaerobic digesters, new digester heating and mixing systems, new control building, and the installation of related electrical and control systems.
Copeland Park Pump Station Stormwater Engineering P4: Construction Construction in Progress 7 $325000.00 2025 Stormwater Improvement Fee This project is to construct a stormwater pump station to address flooding conditions in Copeland Park. Currently, a temporary pump is utilized to drain the low-lying area. A permanent pump station is proposed to replace the need for a temporary pump. This station will be controlled remotely through the City’s SCADA system.
Clark Street and 30th Street Pipe Relocation Stormwater Engineering P5: Closeout Closeout 5 $225000.00 2024 Stormwater Improvement Fee This project provides for relocating and upgrading an existing pond outfall system including installation of new pipes and inlets.
Wastewater Pumping Station Rehabilitation 109th St. PS Wastewater P3: Procurement Permitting/Submittals Approval 7 $2201000.00 2026 PIPES This project provides for the complete rehabilitation of 109th Street Pumping Station at 10902 Marjory Ave. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
Wastewater Pumping Station Rehabilitation Design Build-Idlewild PS Wastewater P4: Construction Construction in Progress $1801300.00 2026 PIPES This project provides for the rehabilitation of the wastewater pumping stations 6304 Orient Road (Parke East Pump Station) and 6001 North Olive Avenue (Idlewild Pump Station). Project will include replacement of pumps, piping, valves, and electrical improvements to ensure continued reliability of the station.
Beach Place Water P3: Procurement Project Startup 4 $288684.81 2028 PIPES Approximately 992 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Peter O Knight Project Water P3: Procurement Consultant/Contractor Selection Process 4 $960089.00 2027 PIPES Approximately 3,218 linear feet of water mains ranging from 12 to 16 inches in diameter will be replaced.
Downtown Core Complete Streets (Tampa St from Brorein St to Jackson St) Transportation P2: Design 60% Design Completion 5 $1000000.00 2026 Yet to be Determined This project provides for multimodal and safety improvements. General maintenance and Complete Streets improvements to several streets and incorporated in this project in the Downtown Core: Tampa St from Brorein St to Jackson St. As part of the project, these roadways will be resurfaced to remove deficiencies and provide a newly finished driving surface. This project will also include multimodal improvements to make these corridors safer for all users in accordance with the City’s Vision Zero initiative. • Parking Protected Buffered Bike Lanes with conflict markings to allow for safer cycling; • Pedestrian Bulb-outs to shorten pedestrian crossing distances; • Enhanced Crosswalks to provide pedestrians with more visibility; • Traffic Calming features to control speeds and reduce the likelihood of fatal crashes; • Reconstructed Curb Ramps to provide ease of use and accessibility to people with disabilities.
O'Brien St - Segment 1 (Cypress St. to Spruce St.) Transportation P5: Closeout Closeout 6 $651450.00 2025 Other Agencies Perform full depth reclamation and resurfacing of N O'Brien Street between W Cypress Street and W Spruce Street and install pavement marking improvements including share the road markings.
MLK Resurfacing from Air Cargo to Dale Mabry Transportation P4: Construction Construction in Progress 6 $950000.00 2026 Local Option Gas Tax Pavement resurfacing
Cass St Drawbridge Improvements Transportation P2: Design 60% Design Completion 5 $158342.75 2026 Yet to be Determined
E Yukon Street Resurfacing from N Florida Ave to Nebraska Ave Transportation P4: Construction Permitting/Submittals Approval 6 $2212900.00 2027 Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the E Yukon street corridor, spanning approximately 0.5 miles from N Florida Ave to Nebraska Ave. E Yukon is a collector roadway serving as a critical access route for the Sulphur Springs neighborhood. The project will include:
• Roadway resurfacing
• Improved pavement markings
• ADA pedestrian ramps