Tampa Convention Center Skyline

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 1 - 25 of 196
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
South Howard Flood Relief Project Stormwater Engineering P2: Design 60% Design Completion 4 $100400000.00 2027 Multiple Funding The South Howard Flood Relief Project involves designing and building a major stormwater conveyance system to improve drainage and reduce flooding along South Howard Avenue and adjacent neighborhoods, including Parkland Estates and Palma Ceia Pines.
El Prado Blvd. Complete Streets & Sidewalks (Omar Ave to Lois Ave; Lois Ave to Bayshore Blvd) Transportation P4: Construction Construction in Progress 4 $6095013.83 2026 Multiple Funding This project provides for multimodal and safety improvements including bike lanes and sidewalks.
West River District Multi-Modal Network and Safety Improvements BUILD Segments 1 - 6 Transportation P4: Construction Construction in Progress 5 $56860000.00 2026 Multiple Funding This project provides for design and construction of a multimodal network for the West River Area.
W Cypress Street Resurfacing (Zone 1) From N Obrien St to N Himes Ave Transportation P2: Design 60% Design Completion 6 $6035773.00 2027 Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 1.9 miles from N Obrien st to N Himes Ave. This section of W Cypress is a collector roadway serving as a critical access route for the Tampa International Airport, Carver City Lincoln Gardens, North Bon Air, Midtown and Oakford Park neighborhoods. The project will include:
  • Roadway resurfacing
  • Improved pavement markings
  • ADA pedestrian ramps
Purity Springs Restoration and Living Shoreline Parks & Recreation P2: Design 90% Design Completion 6 $700000.00 2026 Multiple Funding Restoration and stabilization of the spring run/basin and living shoreline along the Hillsborough River.
Pathways to Palmetto (Design-Build) Transportation P1: Planning Planning 5 $24467804.00 TBD Multiple Funding This project is for the design of 22nd St. and 26th St. as well as the construction of 22nd St./26th St./Bermuda Blvd roadway & seawall. This project will include the following:
  • Design of 22nd St. and 26th St. Complete Streets.
  • Reconstructing/replacing and amenitizing the existing seawall on Bermuda Blvd. including an 8 ft. wide seawall trail*.
  • Installation of backflow preventers at the seawall outfall pipes.
  • Implementation of Complete Streets concept to support the mobility needs of all along Bermuda Blvd.
  • Roadway resurfacing and narrowing travel lanes.
  • Installation of tree wells and bioswales along the roadway shoulders.
  • Connects to the proposed Green ARTery Perimeter Trail.
* The design of Bermuda Blvd roadway and seawall will be completed using a separate project: TRANS20141 - Bermuda Blvd Complete Streets and Seawall project (https://www.tampa.gov/project/trans20141).
Rey Park Improvements Parks & Recreation P4: Construction Construction in Progress 5 $4000000.00 2026-27 Community Redevelopment Agency Improvements to Rey Park site and new community center based on public input.
Bermuda Blvd Complete Streets and Seawall (Design) Transportation P1: Planning Planning 5 $3954400.00 2028 Multiple Funding This project is for the design* of the roadway and seawall along Bermuda Blvd. The design will include the following:
  • Reconstructing/replacing and amenitizing the existing seawall on Bermuda Blvd. including an 8 ft. wide seawall trail.
  • Installation of backflow preventers at the seawall outfall pipes.
  • Implementation of Complete Streets concept to support the mobility needs of all along Bermuda Blvd.
  • Roadway resurfacing and narrowing travel lanes.
  • Installation of tree wells and bioswales along the roadway shoulders.
  • Connects to the proposed Green ARTery Perimeter Trail.
*Construction for this design will be performed under the Pathways to Palmetto (Design-Build) project. https://www.tampa.gov/project/trans20197
Manhattan: Vasconia to Obispo Flooding Relief-Phase 1 Stormwater Engineering P4: Construction Construction in Progress 4 $6800000.00 2025 Stormwater Improvement Fee This project involves the design and construction of a new drainage conveyance system, along with the replacement and upsizing of the existing stormwater infrastructure in a highly urbanized residential neighborhood in the City of Tampa. The area currently experiences frequent street flooding during both normal and high‑intensity rain events due to an old, undersized drainage system. The project is located along Manhattan Avenue at Vasconia Street and extends north to Obispo Street. In addition to the drainage upgrades, the project includes new water main improvements along the corridor to enhance reliability and service.
S Macdill Ave Resurfacing from W Gandy Blvd to W Bay to Bay Blvd Transportation P2: Design 90% Design Completion 4 $3382122.00 2027 Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the S Macdill avenue corridor, spanning approximately 1.8 miles from W Gandy Blvd to W Bay to Bay Blvd. S Macdill is a collector roadway serving as a critical access route for the Bayshore Beautiful and Palma Ceia neighborhoods. The project will include:
  • Roadway resurfacing
  • Improved pavement markings
  • ADA pedestrian ramps
Rivercrest Park Boardwalk Renovation Parks & Recreation P2: Design Permitting/Submittals Approval 6 $1100000.00 2025 Community Investment Taxes This project provides for the replacement of the seawall, boardwalk and docks at Rivercrest Park. Replacement of new structural system, and a new dock system.
Lower Peninsula Watershed Plan - Southeast Region Stormwater Engineering P5: Closeout Closeout 4 $54650000.00 2023 Multiple Funding The Lower Peninsula Watershed covers approximately 8.6 square miles (5,508 acres) within the City of Tampa and has long experienced chronic flooding due to failing and undersized stormwater conveyance systems. A watershed management plan developed in 2019 established a baseline for capital improvement planning and identified conceptual solutions and multiple potential projects to address frequent flooding throughout the region. Planned infrastructure improvements include the design and construction of more than 8,000 linear feet of new box culverts and pipes, new drainage inlets, and a new stormwater outfall to Hillsborough Bay. The City secured cooperative funding from both the Southwest Florida Water Management District (SWFWMD) and the Florida Department of Environmental Protection (FDEP) to support implementation.
Himes Ave & Gandy Blvd - Traffic Signal Upgrade Transportation P2: Design 60% Design Completion 4 $900000.00 2027 Other Agencies This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
Manhattan : Obispo to Bay to Bay Flooding Relief-Phase 2 Stormwater Engineering P1: Planning Planning 4 $3000000.00 On Hold Stormwater Improvement Fee This project consists of design and construction of a new drainage conveyance system as well as the replacement and upsizing of the existing drainage conveyance system in a residential neighborhood in the City of Tampa. During normal rain events the area experiences street flooding due to an old and undersized drainage system. This project is located along Manhattan Avenue tying into the Emerson Ditch at 3111 Manhattan and runs north to Bay to Bay. This project will also consist of new watermain upgrades along the corridor.
Greenways, Trail & Gateway Sign - New Tampa Nature Park Parks & Recreation P2: Design 90% Design Completion 7 $500000.00 2025 Community Investment Taxes This project provides for the design of trails, signage, additional play elements and a restroom facility. Implementation of the project will happen in multiple phases as funding becomes available.
Twiggs St (Ashley Dr to Nebraska Ave) Transportation P2: Design 30% Design Completion 5 $6300000.00 2027 Multiple Funding Lane repurposing to improve Ped/Bicycle facilities and incorporate aspects of Tampa MOVES plan.
Bayshore Blvd & Euclid Ave - New Traffic Signal Transportation P1: Planning Planning 4 $900000.00 2029 Other Agencies This project includes design and construction of a new traffic signal to improve safety and enhance access for the community. The project includes marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
Armenia Ave & Cypress St - Traffic Signal Upgrade Transportation P1: Planning Planning 6 $900000.00 2028 Other Agencies This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
MacDill Ave & Gandy Blvd - Traffic Signal Upgrade Transportation P2: Design 60% Design Completion 4 $900000.00 2027 Other Agencies This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
Bayshore Pumping Station Rehabilitation Wastewater P5: Closeout Closeout 4 $6400000.00 2025 PIPES This project provides for the complete rehabilitation of Bayshore Pumping Station at 3300 Bayshore Dr. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
South Howard Water Improvement Project Water P2: Design 30% Design Completion 4 $4135485.57 2028 PIPES Approximately 7,955 linear feet of water mains ranging from 4 to 12 inches in diameter will be replaced and upgraded.
Brorein St Bridge (#105501) Phase 1 Structural Rehabilitation Transportation P2: Design 90% Design Completion 4 $9220000.00 TBD Local Option Gas Tax This project provides for structural rehabilitation as well as rehabilitation of the mechanical and electrical systems. This project will also create safe multimodal access across the river by widening the sidewalks on both sides of the bridge to about 9 feet wide.
Bayshore Blvd & Swann Ave - New Traffic Signal Transportation P1: Planning Planning 4 $1500000.00 2027 Other Agencies This project includes design and construction of a new traffic signal to improve safety and enhance access for the community. The project includes marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
Columbus Dr & Rome Ave - New Traffic Signal Transportation P2: Design 60% Design Completion 6 $1300000.00 2027 Other Agencies This project includes design and construction of a new traffic signal to improve safety and enhance access for the community. The project includes marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
Manhattan Ave & Bay to Bay Blvd - Traffic Signal Upgrade Transportation P2: Design 60% Design Completion 4 $1200000.00 2027 Other Agencies This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes curb extensions, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.