| Title | Project Type | Project Phase | Planned Start Date | Planned End Date | Status | Council District | Estimated Cost | Fiscal Year | Funding Source | Description |
|---|---|---|---|---|---|---|---|---|---|---|
| South Howard Flood Relief Project | Stormwater Engineering | P2: Design | 60% Design Completion | 4 | $100400000.00 | 2027 | Multiple Funding | The South Howard Flood Relief Project involves designing and building a major stormwater conveyance system to improve drainage and reduce flooding along South Howard Avenue and adjacent neighborhoods, including Parkland Estates and Palma Ceia Pines. | ||
| El Prado Blvd. Complete Streets & Sidewalks (Omar Ave to Lois Ave; Lois Ave to Bayshore Blvd) | Transportation | P4: Construction | Construction in Progress | 4 | $6095013.83 | 2026 | Multiple Funding | This project provides for multimodal and safety improvements including bike lanes and sidewalks. | ||
| West River District Multi-Modal Network and Safety Improvements BUILD Segments 1 - 6 | Transportation | P4: Construction | Construction in Progress | 5 | $56860000.00 | 2026 | Multiple Funding | This project provides for design and construction of a multimodal network for the West River Area. | ||
| W Cypress Street Resurfacing (Zone 1) From N Obrien St to N Himes Ave | Transportation | P2: Design | 60% Design Completion | 6 | $6035773.00 | 2027 | Tax - Other | This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 1.9 miles from N Obrien st to N Himes Ave. This section of W Cypress is a collector roadway serving as a critical access route for the Tampa International Airport, Carver City Lincoln Gardens, North Bon Air, Midtown and Oakford Park neighborhoods. The project will include:
|
||
| Purity Springs Restoration and Living Shoreline | Parks & Recreation | P2: Design | 90% Design Completion | 6 | $700000.00 | 2026 | Multiple Funding | Restoration and stabilization of the spring run/basin and living shoreline along the Hillsborough River. | ||
| Pathways to Palmetto (Design-Build) | Transportation | P1: Planning | Planning | 5 | $24467804.00 | TBD | Multiple Funding | This project is for the design of 22nd St. and 26th St. as well as the construction of 22nd St./26th St./Bermuda Blvd roadway & seawall. This project will include the following:
|
||
| Rey Park Improvements | Parks & Recreation | P4: Construction | Construction in Progress | 5 | $4000000.00 | 2026-27 | Community Redevelopment Agency | Improvements to Rey Park site and new community center based on public input. | ||
| Bermuda Blvd Complete Streets and Seawall (Design) | Transportation | P1: Planning | Planning | 5 | $3954400.00 | 2028 | Multiple Funding | This project is for the design* of the roadway and seawall along Bermuda Blvd. The design will include the following:
|
||
| Manhattan: Vasconia to Obispo Flooding Relief-Phase 1 | Stormwater Engineering | P4: Construction | Construction in Progress | 4 | $6800000.00 | 2025 | Stormwater Improvement Fee | This project involves the design and construction of a new drainage conveyance system, along with the replacement and upsizing of the existing stormwater infrastructure in a highly urbanized residential neighborhood in the City of Tampa. The area currently experiences frequent street flooding during both normal and high‑intensity rain events due to an old, undersized drainage system. The project is located along Manhattan Avenue at Vasconia Street and extends north to Obispo Street. In addition to the drainage upgrades, the project includes new water main improvements along the corridor to enhance reliability and service. | ||
| S Macdill Ave Resurfacing from W Gandy Blvd to W Bay to Bay Blvd | Transportation | P2: Design | 90% Design Completion | 4 | $3382122.00 | 2027 | Tax - Other | This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the S Macdill avenue corridor, spanning approximately 1.8 miles from W Gandy Blvd to W Bay to Bay Blvd. S Macdill is a collector roadway serving as a critical access route for the Bayshore Beautiful and Palma Ceia neighborhoods. The project will include:
|
||
| Rivercrest Park Boardwalk Renovation | Parks & Recreation | P2: Design | Permitting/Submittals Approval | 6 | $1100000.00 | 2025 | Community Investment Taxes | This project provides for the replacement of the seawall, boardwalk and docks at Rivercrest Park. Replacement of new structural system, and a new dock system. | ||
| Lower Peninsula Watershed Plan - Southeast Region | Stormwater Engineering | P5: Closeout | Closeout | 4 | $54650000.00 | 2023 | Multiple Funding | The Lower Peninsula Watershed covers approximately 8.6 square miles (5,508 acres) within the City of Tampa and has long experienced chronic flooding due to failing and undersized stormwater conveyance systems. A watershed management plan developed in 2019 established a baseline for capital improvement planning and identified conceptual solutions and multiple potential projects to address frequent flooding throughout the region. Planned infrastructure improvements include the design and construction of more than 8,000 linear feet of new box culverts and pipes, new drainage inlets, and a new stormwater outfall to Hillsborough Bay. The City secured cooperative funding from both the Southwest Florida Water Management District (SWFWMD) and the Florida Department of Environmental Protection (FDEP) to support implementation. | ||
| Himes Ave & Gandy Blvd - Traffic Signal Upgrade | Transportation | P2: Design | 60% Design Completion | 4 | $900000.00 | 2027 | Other Agencies | This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| Manhattan : Obispo to Bay to Bay Flooding Relief-Phase 2 | Stormwater Engineering | P1: Planning | Planning | 4 | $3000000.00 | On Hold | Stormwater Improvement Fee | This project consists of design and construction of a new drainage conveyance system as well as the replacement and upsizing of the existing drainage conveyance system in a residential neighborhood in the City of Tampa. During normal rain events the area experiences street flooding due to an old and undersized drainage system. This project is located along Manhattan Avenue tying into the Emerson Ditch at 3111 Manhattan and runs north to Bay to Bay. This project will also consist of new watermain upgrades along the corridor. | ||
| Greenways, Trail & Gateway Sign - New Tampa Nature Park | Parks & Recreation | P2: Design | 90% Design Completion | 7 | $500000.00 | 2025 | Community Investment Taxes | This project provides for the design of trails, signage, additional play elements and a restroom facility. Implementation of the project will happen in multiple phases as funding becomes available. | ||
| Twiggs St (Ashley Dr to Nebraska Ave) | Transportation | P2: Design | 30% Design Completion | 5 | $6300000.00 | 2027 | Multiple Funding | Lane repurposing to improve Ped/Bicycle facilities and incorporate aspects of Tampa MOVES plan. | ||
| Bayshore Blvd & Euclid Ave - New Traffic Signal | Transportation | P1: Planning | Planning | 4 | $900000.00 | 2029 | Other Agencies | This project includes design and construction of a new traffic signal to improve safety and enhance access for the community. The project includes marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| Armenia Ave & Cypress St - Traffic Signal Upgrade | Transportation | P1: Planning | Planning | 6 | $900000.00 | 2028 | Other Agencies | This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| MacDill Ave & Gandy Blvd - Traffic Signal Upgrade | Transportation | P2: Design | 60% Design Completion | 4 | $900000.00 | 2027 | Other Agencies | This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes left turn signals, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| Bayshore Pumping Station Rehabilitation | Wastewater | P5: Closeout | Closeout | 4 | $6400000.00 | 2025 | PIPES | This project provides for the complete rehabilitation of Bayshore Pumping Station at 3300 Bayshore Dr. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss. | ||
| South Howard Water Improvement Project | Water | P2: Design | 30% Design Completion | 4 | $4135485.57 | 2028 | PIPES | Approximately 7,955 linear feet of water mains ranging from 4 to 12 inches in diameter will be replaced and upgraded. | ||
| Brorein St Bridge (#105501) Phase 1 Structural Rehabilitation | Transportation | P2: Design | 90% Design Completion | 4 | $9220000.00 | TBD | Local Option Gas Tax | This project provides for structural rehabilitation as well as rehabilitation of the mechanical and electrical systems. This project will also create safe multimodal access across the river by widening the sidewalks on both sides of the bridge to about 9 feet wide. | ||
| Bayshore Blvd & Swann Ave - New Traffic Signal | Transportation | P1: Planning | Planning | 4 | $1500000.00 | 2027 | Other Agencies | This project includes design and construction of a new traffic signal to improve safety and enhance access for the community. The project includes marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| Columbus Dr & Rome Ave - New Traffic Signal | Transportation | P2: Design | 60% Design Completion | 6 | $1300000.00 | 2027 | Other Agencies | This project includes design and construction of a new traffic signal to improve safety and enhance access for the community. The project includes marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| Manhattan Ave & Bay to Bay Blvd - Traffic Signal Upgrade | Transportation | P2: Design | 60% Design Completion | 4 | $1200000.00 | 2027 | Other Agencies | This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes curb extensions, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. |
Was this page helpful? or
Thanks for letting us know!
Help us improve by leaving a quick comment
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.
- OR-
For a formal response complete the Page Enhancement Request form.