All Capital Improvement Projects
This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.
| Title | Project Type | Project Phase | Planned Start Date | Planned End Date | Status | Council District | Estimated Cost | Fiscal Year | Funding Source | Description |
|---|---|---|---|---|---|---|---|---|---|---|
| Sidewalks- Hubert St (W Cypress to W Main St) | Transportation | P5: Closeout | Closeout | 6 | $320000.00 | 2025 | Transportation Impact Fees | This project provides for a new sidewalk 2,000 feet in length and 5 feet in width along both sides of N Hubert Ave, extending from W Cypress St to W Main St, as well as filling any sidewalk gaps within that range. These improvements will contribute to increased school and pedestrian safety, multimodal network connection, and increased access to the local Loretta Ingraham Recreation Complex. | ||
| Sidewalks- Prescott St (S Kissimmee St to West Shore Blvd) | Transportation | P5: Closeout | Closeout | 4 | $32000.00 | 2023 | Sidewalk In-Lieu Fees | This project provides for new sidewalk. |
||
| Sitewide Electrical Improvement | Water | P4: Construction | Final Contract Review & Approval | 5 | $52935137.00 | 2026 | PIPES | The TECO House and Sitewide Electric project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals. | ||
| Sidewalks- 12th St. Sidewalk for Sulphur Springs K-8 | Transportation | P5: Closeout | Closeout | 5 | $35000.00 | 2023 | Sidewalk In-Lieu Fees | This project provides for new sidewalk. |
||
| North Ashley Pond Expansion | Stormwater Engineering | P4: Construction | Project Startup | 7 | $75000.00 | 2025 | Stormwater Improvement Fee | Currently there is substantial flooding on N Tampa St east of the existing Ashley stormwater pond. The project consists of the expansion of the existing stormwater pond to alleviate flooding in the neighborhood | ||
| Green Spine Cycle Track, Segment 3C | Transportation | P5: Closeout | Closeout | 5 | $2544487.00 | 2024 | Multiple Funding | This project provides for a bi-directional cycle track along 15th St. from 13th Avenue to 21st Ave. | ||
| DLT Master Plan DB Task Order 010 Ozone Improvements | Water | P2: Design | 90% Design Completion | 5 | $57700738.00 | 2026 | PIPES | The DLTWTF Master Plan Ozone Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals. | ||
| Lake Forest #1 Pumping Station Rehabilitation (Year 2) | Wastewater | P5: Closeout | Closeout | $1320000.00 | 2025 | PIPES | This project provides for the rehabilitation of Lake Forest #1 wastewater pumping station located at 14753 Morning Dr. Project will include replacement of pumps, piping, valves, and electrical improvements to ensure the continued reliability of the station. | |||
| TCC Renovations Phase II | Convention Center & Tourism | P5: Closeout | Closeout | 5 | $3983058.00 | 2021 | Tourist Development Taxes | This project provides for multi-year renovations at the Tampa Convention Center including but not limited to restroom, elevator, & meeting room upgrades, air handlers & chillers, painting, and other. |
||
| Cass St Drawbridge Improvements | Transportation | P2: Design | 60% Design Completion | 5 | $158342.75 | 2026 | Yet to be Determined | |||
| N 34th Street ADA Improvements from 29th Ave to 33rd Ave | Transportation | P2: Design | 30% Design Completion | 5 | $78000.00 | TBD | Tax - Other | This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pedestrian accessibility and safety improvements along the N 34th street corridor, spanning approximately 0.25 miles from E 29th Ave to E 33rd Ave. N 34th street is a collector roadway serving as a critical access route for the Jackson Heights neighborhood. The project will include ADA pedestrian ramps. | ||
| S. Himes WM R&R | Water | P2: Design | 60% Design Completion | 4 | $2467976.47 | 2027 | PIPES | Approximately 3,368 linear feet of water mains ranging from 2 to 24 inches in diameter will be replaced and upgraded. | ||
| Belmont Heights Gravity Sewer CIPP Lining | Wastewater | P4: Construction | Construction in Progress | 5 | $7970000.00 | 2026 | PIPES | This project includes the rehabilitation of approximately 143,264 linear feet of 8-inch, 5,581 linear feet of 10-inch, 1,604 linear feet of 12-inch, 3,317 linear feet of 15-inch, and 3,744 linear feet of 18-inch diameter gravity sewers and the rehabilitation of manholes. | ||
| Sulphur Springs PS FM Rehabilitation | Wastewater | P2: Design | 90% Design Completion | 5 | $6068935.00 | 2026 | PIPES | This project provides for the rehabilitation of the force main that serves the Sulphur Springs Pumping Station located at 7902 N 13th St. The scope includes approximately 24,500 linear feet of 42” and 48” force main extending to the force main discharge at E 29th Ave and N 26th St. As Part of this project the existing force main will be cleaned and rehabilitated to address significant clogging. The cleaning process will allow for a detailed inspection to assess overall condition of the force main. To maintain continuous service during cleaning, an abandoned force main in the vicinity will be reactivated and temporarily placed in service as a bypass to ensure the normal high flows from the PS are conveyed without interruption. The old force main will be left available long after the project is complete, providing more flexibility and resiliency for future challenges. | ||
| The Heights WM Improvement Project Along Florida Ave from Palm Ave to Dr MLK JR Blvd (Phase II) | Water | P3: Procurement | Project Startup | 5 | $4534147.75 | 2027 | PIPES | Approximately 7,019 linear feet of water mains ranging from 8 to 12 inches in diameter will be replaced. | ||
| NTCB Elmer Pond Expansion | Stormwater Engineering | P2: Design | 30% Design Completion | 7 | $90000.00 | 2027 | Stormwater Improvement Fee | Property acquisition and pond expansion | ||
| 17TH and Annona | Stormwater Engineering | P3: Procurement | Contract Negotiations | 7 | $300000.00 | 2026 | Stormwater Improvement Fee | Construction of new inlets and pipes connecting to the existing system | ||
| Floribraska | Water | P5: Closeout | Closeout | 5 | $1794339.00 | 2023 | PIPES | The Floribraska project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 2,682 Linear Feet of water mains 8 inches in diameter will be replaced and upgraded. |
||
| Sidewalks- 9th St (Bougainvillea Ave to Linebaugh Ave) | Transportation | P5: Closeout | Closeout | 5 | $85000.00 | 2023 | Sidewalk In-Lieu Fees | This project provides for new sidewalk. |
||
| Tampa St and 7th Ave - Traffic Signal | Transportation | P5: Closeout | Closeout | 5 | $500000.00 | 2023 | Multiple Funding | This project provides for construction of a new traffic signal at the intersection of Tampa Street and 7th Avenue. |
||
| East/West Columbus Drive | Water | P5: Closeout | Closeout | 5 | $1438509.21 | 2023 | PIPES | The East/West Columbus Drive project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 4,800 Linear Feet of water mains ranging from 8 to 12 inches in diameter will be replaced and upgraded. |
||
| Green Spine Cycle Track, Segment 3B | Transportation | P5: Closeout | Closeout | 5 | $1645831.00 | 2024 | Multiple Funding | This project provides for a bi-directional cycle track along Nuccio Pkwy from 7th Ave. to 13th Ave. | ||
| Sulphur Springs K-8 Safe Routes to School | Transportation | P5: Closeout | Cancelled | 5 | $495000.00 | 2024 | Grants | This project provides for safety improvements, traffic calming, and pedestrian facilities to establish a safe walking route to school. |
||
| Clark Street and 30th Street Pipe Relocation | Stormwater Engineering | P5: Closeout | Closeout | 5 | $225000.00 | 2024 | Stormwater Improvement Fee | This project provides for relocating and upgrading an existing pond outfall system including installation of new pipes and inlets. | ||
| Wastewater Pumping Station Rehabilitation Prescott PS | Wastewater | P3: Procurement | Permitting/Submittals Approval | 4 | $3089233.00 | 2026 | PIPES | This project provides for the complete rehabilitation of Prescott Pumping Station at 4806 Prescott St. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss. |
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.
