Tampa Convention Center sunset

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 126 - 150 of 196
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
High Service Pump Station (GMP 2) Water P5: Closeout Closeout 5 $65985127.00 2021 PIPES The High Service Pump Station project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Cleveland St and Rome Ave - Traffic Signal Transportation P4: Construction Construction in Progress 6 $586089.19 2026 Transportation Impact Fees This project provides for intersection improvements and a new traffic signal.
FY20 CIP Water Main Improvements Design-Build_JFK Blvd - GMP 2 Water P5: Closeout Closeout 4 $5012756.50 2022 PIPES Amendment 2 (aka GMP 4) to the FY20 CIP Water Main Improvements Design-Build Project_JFK Blvd project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 18,550 Linear Feet of water mains ranging from 6 to 16 inches in diameter will be replaced and upgraded.
East/West Columbus Drive Water P5: Closeout Closeout 5 $1438509.21 2023 PIPES

The East/West Columbus Drive project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 4,800 Linear Feet of water mains ranging from 8 to 12 inches in diameter will be replaced and upgraded.

Downtown Phase II Collection System Rehabilitation Wastewater P5: Closeout Closeout 5 $1600000.00 2023 PIPES This project includes the rehabilitation of approximately 34,476 linear feet of 8-inch to 24-inch diameter gravity sewers and the rehabilitation of 480 manholes.
JPA- FDOT Height Multimodal Improvements Wastewater P2: Design 60% Design Completion 5 $1000000.00 2028 PIPES This project provides for the relocation of gravity mains that will be impacted based upon the FDOT’s proposed roadway and drainage improvements project.
Hanna Avenue Phase II (22nd St to 30th St) Transportation P2: Design 90% Design Completion 5 $3311065.00 TBD Yet to be Determined This project provides for design and construction of capacity and multimodal improvements along the E Hanna Ave corridor from N 22nd St to N 30th Sr., along the 24th St from Hanna Ave to Sligh Ave, and at the intersection of Sligh Ave and 30th St. The project includes the following proposed improvements:
  1. Hanna Avenue – 22nd Street to 30th Street:
    • Roadway milling and resurfacing.
    • Westbound Left Turn Lane into the new City Center at 2515 Hanna Ave.
    • Intersection improvements at the intersection of Hanna Ave at N 22nd St and Hanna Ave at N 30th Street.
  2. 24th Street – Hanna Avenue to Sligh Avenue.
    • Sidewalk along the west side of 24th Street.
    • All Way Stop Signs at “T” intersection along 24th Street.
  3. Intersection at the Sligh Avenue and 30th Street.
    • New Traffic Signal.
    • Northbound Left-Turn Lane.
Sunset Park West_A Water P5: Closeout Closeout 4 $4670025.80 2021 PIPES

The Sunset Park West_A project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 19,202 Linear Feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.

Green Spine Cycle Track, Segment 3C Transportation P5: Closeout Closeout 5 $2544487.00 2024 Multiple Funding This project provides for a bi-directional cycle track along 15th St. from 13th Avenue to 21st Ave.
Wastewater Pumping Station Rehabilitation Parke East PS Wastewater P5: Closeout Closeout $1801300.00 2025 PIPES This project provides for the rehabilitation of the wastewater pumping stations 6304 Orient Road (Parke East Pump Station) and 6001 North Olive Avenue (Idlewild Pump Station). Project will include replacement of pumps, piping, valves, and electrical improvements to ensure continued reliability of the station.
Wastewater Pumping Station Rehabilitation 109th St. PS Wastewater P4: Construction Construction in Progress 7 $2201000.00 2026 PIPES This project provides for the complete rehabilitation of 109th Street Pumping Station at 10902 Marjory Ave. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
DLTWTF Master Plan Task Order 013 Filter Improvements Water P4: Construction Construction in Progress 5 $119121495.00 2024 PIPES The DLTWTF Master Plan Filter Improvements project will optimize facility performance capabilities, improve water quality and expand our water treatment capacity. This project will rehabilitate and replace existing infrastructure and eliminate deteriorating facilities and equipment to increase operational and maintenance efficiency. New infrastructure upgrades will increase our capacity to produce drinking water and we will also add new back-up systems to strengthen our resiliency when faced with a natural disaster or other emergency. New treatment processes will also be explored to achieve the twin goals of enhancing the taste and odor of our drinking water while reducing the use of water treatment chemicals.
Conover and 13th Stormwater Engineering P4: Construction Permitting/Submittals Approval 5 $90000.00 2027 Stormwater Improvement Fee Intersection area of 13th Street and Conover Street experiences frequent flooding due to insufficient drainage capacity. The proposed project consists of construction of new pipes and inlets connecting to the existing drainage system to alleviate the flooding.
Willow Ave WM Replacement Water P2: Design 30% Design Completion 5 $7888229.34 2028 PIPES Approximately 17,373 linear feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
30th St Sligh Intersection Improvements Transportation P2: Design 90% Design Completion 5 $281344.00 2027 Local Option Gas Tax

This project provides for design and construction of capacity and multimodal improvements along the E Hanna Ave corridor from N 22nd St to N 30th Sr., along the 24th St from Hanna Ave to Sligh Ave, and at the intersection of Sligh Ave and 30th St. The project includes the following proposed improvements:

  1. Hanna Avenue – 22nd Street to 30th Street:
    • Roadway milling and resurfacing.
    • Westbound Left Turn Lane into the new City Center at 2515 Hanna Ave.
    • Intersection improvements at the intersection of Hanna Ave at N 22nd St and Hanna Ave at N 30th St
  2. 24th Street – Hanna Avenue to Sligh Avenue:
    • Sidewalk along the west side of 24th St
    • All Way Stop Signs at “T” intersection along 24th St
  3. Intersection at the Sligh Avenue and 30th Street:
    • New Traffic Signal
    • Northbound Left-Turn Lane.
Branch PS Collection System CIPP Lining Wastewater P5: Closeout Closeout 6 $1999350.00 2025 PIPES This project includes the rehabilitation of approximately 15,087 linear feet of 8-inch to 21-inch diameter gravity sewers and the rehabilitation of 45 manholes.
N 34th Street ADA Improvements from 29th Ave to 33rd Ave Transportation P2: Design 30% Design Completion 5 $78000.00 TBD Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pedestrian accessibility and safety improvements along the N 34th street corridor, spanning approximately 0.25 miles from E 29th Ave to E 33rd Ave. N 34th street is a collector roadway serving as a critical access route for the Jackson Heights neighborhood. The project will include ADA pedestrian ramps.
Ybor PS FM Rehabilitation Wastewater P2: Design 30% Design Completion 5 $6898000.00 2028 PIPES This project provides for the rehabilitation of the force main that serves the Ybor Pumping Station located at 1302 N 25th St. The scope includes approximately 1,090 feet of 72” force main along 26th Street, which will be rehabilitated or replaced due to its deteriorated condition. As a part of this project, a new 36” force main will be constructed from the Ybor Station to the intersection of 34th street and 3rd avenue to function as a temporary bypass to divert the normal high flows from the Ybor Pump Station during the replacement of the existing 72”. The 36” FM will be left available long after the project is complete, providing more flexibility and resiliency for future challenges.
Hampton Terrace Project A Water P2: Design 90% Design Completion 6 $6312515.25 2026 PIPES Approximately 19,403 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
North Ybor Phase I Water P2: Design 60% Design Completion 5 $3435469.56 2028 PIPES Approximately 9,604 linear feet of water mains ranging from 2 to 12 inches in diameter will be replaced.
Oakford Park Phase I Water P2: Design 60% Design Completion 6 $3499580.93 2028 PIPES Approximately 15,211 linear feet of water mains ranging from 2 to 4 inches in diameter will be replaced and upgraded.
18th St Pumping Station Rehabilitation Wastewater P2: Design 30% Design Completion 5 $5500000.00 2028 PIPES This project provides for the complete rehabilitation of 18th St. Pumping Station at 9707 N 18th St. The project will serve to replace the existing wet-dry type pumping station with a more efficient, reliable, and serviceable submersible pumping station. It includes demolition of above ground building structure, pumps and electrical equipment and installation of new submersible pumps, piping, valves, control panel and electrical upgrades. The new electrical and control equipment will be installed aboveground and will be designed to provide protection from flooding and wind damage associated with storm events. The project also includes the installation of a backup generator to maintain station operation in the event of a power loss.
MacDill Air Force Base Access Improvements (Interbay Blvd between West Shore Blvd and S. Bayshore Blvd) - Segment 2 (Between S Manhattan Ave and S Dale Mabry Hwy) Transportation P2: Design 30% Design Completion 4 $2862074.00 2027 Multiple Funding This project improves 2.93 miles of roadway to improve Air Force Base access. Interbay Boulevard will be converted from an existing 2-lane undivided road to a 3-lane divided road, west of Dale Mabry Hwy (SR 573), and pavement will be resurfaced and restriped. The project will construct intermittent widening of the roadway to accommodate a center two-way left-turn lane (or intermittent left-turn pockets) along the corridor from West Shore Blvd to Dale Mabry Hwy (SR 573). This project is supported by MacDill Air Force Base, the Department of the Air Force, and neighborhoods surrounding the corridor.
Foundation for Tampa’s Neighborhoods Project_MacFarlane Park Area Water P5: Closeout Closeout 6 $7124488.05 2022 PIPES The Foundation for Tampa’s Neighborhoods Project_MacFarlane Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 53,021 Linear Feet of water mains ranging from 2 to 24 inches in diameter will be replaced and upgraded.
Palma Ceia Area 2 (AKA Phase III) Water P5: Closeout Closeout 4 $5893216.60 2021 PIPES The Palma Ceia Area 2 (AKA Phase III) project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 31,717 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded