All Capital Improvement Projects
This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.
| Title | Project Type | Project Phase | Planned Start Date | Planned End Date | Status | Council District | Estimated Cost | Fiscal Year | Funding Source | Description |
|---|---|---|---|---|---|---|---|---|---|---|
| Downtown Core Complete Streets (Tampa St from Brorein St to Jackson St) | Transportation | P2: Design | 60% Design Completion | 5 | $1000000.00 | 2026 | Yet to be Determined | This project provides for multimodal and safety improvements. General maintenance and Complete Streets improvements to several streets and incorporated in this project in the Downtown Core: Tampa St from Brorein St to Jackson St. As part of the project, these roadways will be resurfaced to remove deficiencies and provide a newly finished driving surface. This project will also include multimodal improvements to make these corridors safer for all users in accordance with the City’s Vision Zero initiative.
|
||
| 43rd St Ditch Rehabilitation | Stormwater Engineering | P5: Closeout | Closeout | 5 | $2300000.00 | 2025 | Multiple Funding | The project is located just west of the Tampa Distribution Center at 1212 N. 50th Street, identified as part of the broader 43rd Street Drainage Improvements due to the nearest downstream crossing. The work includes approximately 700 linear feet of concrete slope stabilization along an existing ditch, with all associated miscellaneous and appurtenant improvements needed to enhance long‑term stability and drainage performance. | ||
| 30th Street (USF) Force Main Relocation | Wastewater | P4: Construction | Construction in Progress | 7 | $2379401.00 | 2025 | PIPES | Replace and extend the existing 12” USF force main on 30th St. south of Fowler Ave. to north of 109th Ave with 2,150 LF of 18” PVC force main. | ||
| Lincoln Ave & Columbus Dr - Traffic Signal Upgrade | Transportation | P1: Planning | Planning | 6 | $900000.00 | 2028 | Other Agencies | This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes curb extensions, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats. | ||
| Foundation for Tampa’s Neighborhoods Project_Virginia Park Area | Water | P5: Closeout | Closeout | 4 | $8677855.56 | 2022 | PIPES | The Foundation for Tampa’s Neighborhoods Project_Virginia Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 40,333 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded. |
||
| Sidewalks- Hubert St (W Cypress to W Main St) | Transportation | P5: Closeout | Closeout | 6 | $320000.00 | 2025 | Transportation Impact Fees | This project provides for a new sidewalk 2,000 feet in length and 5 feet in width along both sides of N Hubert Ave, extending from W Cypress St to W Main St, as well as filling any sidewalk gaps within that range. These improvements will contribute to increased school and pedestrian safety, multimodal network connection, and increased access to the local Loretta Ingraham Recreation Complex. | ||
| 21st St and Palm Ave - Traffic Signal Replacement | Transportation | P4: Construction | Construction in Progress | 5 | $292344.18 | 2026 | Local Option Gas Tax | This project provides for the replacement and upgrade of the traffic signal at the intersection of North 21st Street and East Palm Avenue. Additionally, ADA accommodations will be upgraded as necessary. | ||
| FY20 CIP Water Main Improvements Design-Build_W Riverside Heights – GMP 5 | Water | P5: Closeout | Closeout | 6 | $4912885.00 | 2026 | PIPES | The W Riverside Heights Project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 9,747 Linear Feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. | ||
| Howard F. Curren AWTP Master Plan Improvements, Phase 1, Design-build GMP No. 2 | Wastewater | P4: Construction | Construction in Progress | 5 | $77604828.00 | 2023 | PIPES | This project provides for the rehabilitation of the main pumping station and the high purity oxygen (HPO) reactors at the Howard F. Curren AWTP. The project will include replacement of the seven (7) main sewage pumps, blowers, spent cooling water pumps, process piping and valves, mixers, aerators and diffusers, concrete repairs and coatings, the construction of a new electrical building and transformer structure, and the installation of new electrical and control systems. | ||
| Clark Street and 30th Street Pipe Relocation | Stormwater Engineering | P5: Closeout | Closeout | 5 | $225000.00 | 2024 | Stormwater Improvement Fee | This project provides for relocating and upgrading an existing pond outfall system including installation of new pipes and inlets. | ||
| Neighborhood Improvements- West Riverside Heights | Transportation | P4: Construction | Permitting/Submittals Approval | 6 | $2100000.00 | 2027 | Local Option Gas Tax | This project provides for street resurfacing, traffic calming and pedestrian infrastructure within the West Riverside Heights Neighborhood. | ||
| Glen Ave Sidewalk and Safety Improvements (Green St to Beach St) | Transportation | P5: Closeout | Closeout | 6 | $1672823.61 | 2025 | Multiple Funding | This project provides for drainage improvements and sidewalk construction. | ||
| Gunlock PS Generator Addition | Wastewater | P5: Closeout | Closeout | $650500.00 | 2024 | PIPES | This project provides for the installation of a standby generator & electrical upgrades at the Gunlock pumping station. | |||
| Floribraska Ave (Tampa St to 9th St) | Transportation | P5: Closeout | Closeout | 5 | $2399631.00 | 2025 | Multiple Funding | This project provides for multimodal and safety improvements including on-street bicycle lanes. | ||
| Convention Center Renovations | Convention Center & Tourism | P5: Closeout | Closeout | 5 | $38134770.53 | 2021 | Tourist Development Taxes | This project provides for multi-year renovations at the Tampa Convention Center including but not limited to restroom, elevator, & meeting room upgrades, air handler & door replacement, painting, and other improvements as needed. |
||
| Training Burn Simulator and Skills Tower | Fire | P5: Closeout | Closeout | 5 | $2571898.00 | 2023 | Tax - Other | This project provides for the construction of a burn simulator for firefighting. The remediation of the firefighter skills tower is required for continued training for current and recruits training. |
||
| Palmetto Beach | Water | P2: Design | 30% Design Completion | 5 | $1121350.22 | 2028 | PIPES | Approximately 2,348 linear feet of water mains ranging from 8 to 12 inches in diameter will be replaced. | ||
| New Tampa Blvd Corridor Improvements From Meadow Pine Dr. to Bruce B. Downs Blvd. (Resurfacing) | Transportation | P4: Construction | Construction in Progress | 7 | $1030028.00 | 2026 | Local Option Gas Tax | The project provides pavement resurfacing and pedestrian accessibility and safety improvements along the New Tampa Blvd corridor, spanning approximately 1.8 miles from Meadow Pines Drive to Bruce B. Downs Boulevard. New Tampa Boulevard is a collector roadway serving as a critical access route for the West Meadows and Richmond Place neighborhoods. The project will include:
|
||
| Ashley and Madison - Signals (SMD) | Transportation | P5: Closeout | Closeout | 5 | $84810.56 | 2025 | Local Option Gas Tax | New mast arm replacement at intersection old mast arm beyond life. | ||
| Lakeshore PS Force Main Replacement | Wastewater | P2: Design | 60% Design Completion | 5 | $3500000.00 | 2027 | PIPES | This project provides for the replacement of the force main that serves the Lakeshore pumping station. Proposed 4,000 LF of 12” FM replacement. | ||
| W Cypress Street Resurfacing (Zone 2) from N Himes Ave to North Blvd | Transportation | P2: Design | 60% Design Completion | 5 | $3740451.00 | 2028 | Tax - Other | This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 2.0 miles from N Himes Ave to North Blvd. This section of W Cypress is a collector roadway serving as a critical access route for the Midtown, Oakford Park, Armory Gardens, North Hyde Park and West Riverfront neighborhoods. The project will include:
|
||
| Empedrado St | Water | P4: Construction | Permitting/Submittals Approval | 4 | $790573.70 | 2026 | PIPES | Approximately 4,921 Linear Feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. The project area and the streets impacted by this project are shown on the attached map. | ||
| Drew Park CRA - Mobility, Connectivity, and Safety Improvements | Transportation | P2: Design | 60% Design Completion | 6 | $9504000.00 | 2027 | Community Redevelopment Agency | To identify and recommend potential mobility, connectivity, and safety projects, including project estimates, and to identify/recommend/provide quick bid options for improvements for improvements within public rights-of-way throughout the Drew Park Community Redevelopment Area (CRA). | ||
| Hampton Terrace Project B | Water | P2: Design | 60% Design Completion | 6 | $6603637.59 | 2027 | PIPES | Approximately 19,843 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. | ||
| MacDill Air Force Base Access Improvements (Interbay Blvd between West Shore Blvd and S. Bayshore Blvd) - Segment 3 (Between S Dale Mabry Hwy and S Bayshore Blvd) | Transportation | P2: Design | 30% Design Completion | 4 | $2500000.00 | TBD | Yet to be Determined | This project improves 2.93 miles of roadway to improve Air Force Base access. Interbay Boulevard will be converted from an existing 2-lane undivided road to a 3-lane divided road, west of Dale Mabry Hwy (SR 573), and pavement will be resurfaced and restriped. The project will construct intermittent widening of the roadway to accommodate a center two-way left-turn lane (or intermittent left-turn pockets) along the corridor from West Shore Blvd to Dale Mabry Hwy (SR 573). This project is supported by MacDill Air Force Base, the Department of the Air Force, and neighborhoods surrounding the corridor. |
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.