Downtown Core Complete Streets (Brorein St from Ashley Dr to Morgan St) Transportation P5: Closeout Closeout 5 $1900000.00 2025 Local Option Gas Tax
Gray Gables Water P2: Design 90% Design Completion 6 $4969604.29 2027 PIPES
Downtown Phase II Collection System Rehabilitation Wastewater P5: Closeout Closeout 5 $1600000.00 2023 PIPES
MLK Resurfacing from Air Cargo to Dale Mabry Transportation P4: Construction Construction in Progress 6 $950000.00 2026 Local Option Gas Tax
Sherwood Heights PS FM Relocation Wastewater P2: Design 90% Design Completion 7 $250000.00 2026 PIPES
Brorein St Bridge (#105501) Phase 1 Structural Rehabilitation Transportation P2: Design 90% Design Completion 4 $9220000.00 TBD Local Option Gas Tax
Foundation for Tampa's Neighborhoods Project_Forest Hills Area Water P5: Closeout Closeout 7 $5454315.43 2022 PIPES
D. L. Tippin Chemical System Improvements Water P4: Construction Construction in Progress 5 $41057978.00 2021 PIPES
Wastewater Pumping Station Rehabilitation Design Build-Idlewild PS Wastewater P4: Construction Construction in Progress $1801300.00 2026 PIPES
Willow Ave WM Replacement Water P2: Design 30% Design Completion 5 $7888229.34 2028 PIPES
Clark Street and 30th Street Pipe Relocation Stormwater Engineering P5: Closeout Closeout 5 $225000.00 2024 Stormwater Improvement Fee
122nd Street PS FM Replacement Wastewater P2: Design 90% Design Completion $116600.00 2027 PIPES
East/West Columbus Drive Water P5: Closeout Closeout 5 $1438509.21 2023 PIPES
17TH and Annona Stormwater Engineering P3: Procurement Contract Negotiations 7 $300000.00 2026 Stormwater Improvement Fee
Armory Gardens Water P3: Procurement Project Startup 6 $1156019.80 2027 PIPES
FY20 CIP Water Main Improvements Design-Build_W Chelsea St Transmission – GMP 5 Water P4: Construction Construction in Progress 6 $8053583.41 2026 PIPES
Palma Ceia Area 2 (AKA Phase III) Water P5: Closeout Closeout 4 $5893216.60 2021 PIPES
Harbour Island Force Main Replacement Wastewater P5: Closeout Closeout 5 $83042970.00 2021 PIPES
Tampa Heights WM Replacement Phase II Water P2: Design 30% Design Completion 5 $1447393.74 2028 PIPES
Franklin St and Fort Brooke Garage - Blank Out Signs Transportation P2: Design 90% Design Completion 5 $72000.00 2026 Yet to be Determined
Howard F. Curren AWTP Master Plan Improvements, Phase 1, Design-build GMP No. 2 Wastewater P4: Construction Construction in Progress 5 $77604828.00 2023 PIPES
S.E. Seminole Heights Flooding Relief (GMP 1) Stormwater Engineering P4: Construction Construction in Progress 6 $30000000.00 2022 Stormwater Improvement Fee
Louisiana Ave Water Pipe Replacement Water P2: Design 60% Design Completion 5 $230346.81 2027 PIPES
Ashley and Madison - Signals (SMD) Transportation P5: Closeout Closeout 5 $84810.56 2025 Local Option Gas Tax
Church Pumping Station Rehabilitation (Year 3) Wastewater P2: Design 30% Design Completion 4 $1200000.00 2027 PIPES