Tampa Convention Center sunset

All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 76 - 100 of 196
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
Downtown Core Complete Streets (Tampa St from Brorein St to Jackson St) Transportation P2: Design 60% Design Completion 5 $1000000.00 2026 Yet to be Determined This project provides for multimodal and safety improvements. General maintenance and Complete Streets improvements to several streets and incorporated in this project in the Downtown Core: Tampa St from Brorein St to Jackson St. As part of the project, these roadways will be resurfaced to remove deficiencies and provide a newly finished driving surface. This project will also include multimodal improvements to make these corridors safer for all users in accordance with the City’s Vision Zero initiative.
  • Parking Protected Buffered Bike Lanes with conflict markings to allow for safer cycling;
  • Pedestrian Bulb-outs to shorten pedestrian crossing distances;
  • Enhanced Crosswalks to provide pedestrians with more visibility;
  • Traffic Calming features to control speeds and reduce the likelihood of fatal crashes;
  • Reconstructed Curb Ramps to provide ease of use and accessibility to people with disabilities.
43rd St Ditch Rehabilitation Stormwater Engineering P5: Closeout Closeout 5 $2300000.00 2025 Multiple Funding The project is located just west of the Tampa Distribution Center at 1212 N. 50th Street, identified as part of the broader 43rd Street Drainage Improvements due to the nearest downstream crossing. The work includes approximately 700 linear feet of concrete slope stabilization along an existing ditch, with all associated miscellaneous and appurtenant improvements needed to enhance long‑term stability and drainage performance.
30th Street (USF) Force Main Relocation Wastewater P4: Construction Construction in Progress 7 $2379401.00 2025 PIPES Replace and extend the existing 12” USF force main on 30th St. south of Fowler Ave. to north of 109th Ave with 2,150 LF of 18” PVC force main.
Lincoln Ave & Columbus Dr - Traffic Signal Upgrade Transportation P1: Planning Planning 6 $900000.00 2028 Other Agencies This project includes design and replacement of traffic signals to improve safety and enhance access for the community. The project includes curb extensions, marked crosswalks, pedestrian signals, ADA-compliant ramps, and detectable warning mats.
Foundation for Tampa’s Neighborhoods Project_Virginia Park Area Water P5: Closeout Closeout 4 $8677855.56 2022 PIPES

The Foundation for Tampa’s Neighborhoods Project_Virginia Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 40,333 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.

Sidewalks- Hubert St (W Cypress to W Main St) Transportation P5: Closeout Closeout 6 $320000.00 2025 Transportation Impact Fees This project provides for a new sidewalk 2,000 feet in length and 5 feet in width along both sides of N Hubert Ave, extending from W Cypress St to W Main St, as well as filling any sidewalk gaps within that range. These improvements will contribute to increased school and pedestrian safety, multimodal network connection, and increased access to the local Loretta Ingraham Recreation Complex.
21st St and Palm Ave - Traffic Signal Replacement Transportation P4: Construction Construction in Progress 5 $292344.18 2026 Local Option Gas Tax This project provides for the replacement and upgrade of the traffic signal at the intersection of North 21st Street and East Palm Avenue. Additionally, ADA accommodations will be upgraded as necessary.
FY20 CIP Water Main Improvements Design-Build_W Riverside Heights – GMP 5 Water P5: Closeout Closeout 6 $4912885.00 2026 PIPES The W Riverside Heights Project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 9,747 Linear Feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Howard F. Curren AWTP Master Plan Improvements, Phase 1, Design-build GMP No. 2 Wastewater P4: Construction Construction in Progress 5 $77604828.00 2023 PIPES This project provides for the rehabilitation of the main pumping station and the high purity oxygen (HPO) reactors at the Howard F. Curren AWTP. The project will include replacement of the seven (7) main sewage pumps, blowers, spent cooling water pumps, process piping and valves, mixers, aerators and diffusers, concrete repairs and coatings, the construction of a new electrical building and transformer structure, and the installation of new electrical and control systems.
Clark Street and 30th Street Pipe Relocation Stormwater Engineering P5: Closeout Closeout 5 $225000.00 2024 Stormwater Improvement Fee This project provides for relocating and upgrading an existing pond outfall system including installation of new pipes and inlets.
Neighborhood Improvements- West Riverside Heights Transportation P4: Construction Permitting/Submittals Approval 6 $2100000.00 2027 Local Option Gas Tax This project provides for street resurfacing, traffic calming and pedestrian infrastructure within the West Riverside Heights Neighborhood.
Glen Ave Sidewalk and Safety Improvements (Green St to Beach St) Transportation P5: Closeout Closeout 6 $1672823.61 2025 Multiple Funding This project provides for drainage improvements and sidewalk construction.
Gunlock PS Generator Addition Wastewater P5: Closeout Closeout $650500.00 2024 PIPES This project provides for the installation of a standby generator & electrical upgrades at the Gunlock pumping station.
Floribraska Ave (Tampa St to 9th St) Transportation P5: Closeout Closeout 5 $2399631.00 2025 Multiple Funding This project provides for multimodal and safety improvements including on-street bicycle lanes.
Convention Center Renovations Convention Center & Tourism P5: Closeout Closeout 5 $38134770.53 2021 Tourist Development Taxes

This project provides for multi-year renovations at the Tampa Convention Center including but not limited to restroom, elevator, & meeting room upgrades, air handler & door replacement, painting, and other improvements as needed.

Training Burn Simulator and Skills Tower Fire P5: Closeout Closeout 5 $2571898.00 2023 Tax - Other

This project provides for the construction of a burn simulator for firefighting. The remediation of the firefighter skills tower is required for continued training for current and recruits training.

Palmetto Beach Water P2: Design 30% Design Completion 5 $1121350.22 2028 PIPES Approximately 2,348 linear feet of water mains ranging from 8 to 12 inches in diameter will be replaced.
New Tampa Blvd Corridor Improvements From Meadow Pine Dr. to Bruce B. Downs Blvd. (Resurfacing) Transportation P4: Construction Construction in Progress 7 $1030028.00 2026 Local Option Gas Tax The project provides pavement resurfacing and pedestrian accessibility and safety improvements along the New Tampa Blvd corridor, spanning approximately 1.8 miles from Meadow Pines Drive to Bruce B. Downs Boulevard. New Tampa Boulevard is a collector roadway serving as a critical access route for the West Meadows and Richmond Place neighborhoods. The project will include:
  • Roadway resurfacing
  • Improved pavement markings
  • ADA pedestrian ramps
Ashley and Madison - Signals (SMD) Transportation P5: Closeout Closeout 5 $84810.56 2025 Local Option Gas Tax New mast arm replacement at intersection old mast arm beyond life.
Lakeshore PS Force Main Replacement Wastewater P2: Design 60% Design Completion 5 $3500000.00 2027 PIPES This project provides for the replacement of the force main that serves the Lakeshore pumping station. Proposed 4,000 LF of 12” FM replacement.
W Cypress Street Resurfacing (Zone 2) from N Himes Ave to North Blvd Transportation P2: Design 60% Design Completion 5 $3740451.00 2028 Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the W Cypress street corridor, spanning approximately 2.0 miles from N Himes Ave to North Blvd. This section of W Cypress is a collector roadway serving as a critical access route for the Midtown, Oakford Park, Armory Gardens, North Hyde Park and West Riverfront neighborhoods. The project will include:
  • Roadway resurfacing
  • Improved pavement markings
  • ADA pedestrian ramps
Empedrado St Water P4: Construction Permitting/Submittals Approval 4 $790573.70 2026 PIPES Approximately 4,921 Linear Feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. The project area and the streets impacted by this project are shown on the attached map.
Drew Park CRA - Mobility, Connectivity, and Safety Improvements Transportation P2: Design 60% Design Completion 6 $9504000.00 2027 Community Redevelopment Agency To identify and recommend potential mobility, connectivity, and safety projects, including project estimates, and to identify/recommend/provide quick bid options for improvements for improvements within public rights-of-way throughout the Drew Park Community Redevelopment Area (CRA).
Hampton Terrace Project B Water P2: Design 60% Design Completion 6 $6603637.59 2027 PIPES Approximately 19,843 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
MacDill Air Force Base Access Improvements (Interbay Blvd between West Shore Blvd and S. Bayshore Blvd) - Segment 3 (Between S Dale Mabry Hwy and S Bayshore Blvd) Transportation P2: Design 30% Design Completion 4 $2500000.00 TBD Yet to be Determined This project improves 2.93 miles of roadway to improve Air Force Base access. Interbay Boulevard will be converted from an existing 2-lane undivided road to a 3-lane divided road, west of Dale Mabry Hwy (SR 573), and pavement will be resurfaced and restriped. The project will construct intermittent widening of the roadway to accommodate a center two-way left-turn lane (or intermittent left-turn pockets) along the corridor from West Shore Blvd to Dale Mabry Hwy (SR 573). This project is supported by MacDill Air Force Base, the Department of the Air Force, and neighborhoods surrounding the corridor.