N Grady Ave Ditch Rehabilitation Stormwater Engineering P4: Construction Final Contract Review & Approval 6 $1270000.00 2025 Stormwater Improvement Fee Project area is located on the east side of N Grady Avenue south of W Spruce Street as is identified as the Grady Avenue Drainage Improvements. Work involves demolition of trees and guardrail, installation of ten (10) storm sewer structures and large diameter piping to enclose an existing 800-ft ditch corridor. Work includes approximately 200 feet of 36” RCP pipe and approximately 490 feet of 60”x38” ERCP pipe. and all miscellaneous and appurtenant work.
MLK Resurfacing from Air Cargo to Dale Mabry Transportation P4: Construction Construction in Progress 6 $950000.00 2026 Local Option Gas Tax Pavement resurfacing
N Boulevard Resurfacing from W Green St to W Dr MLK Blvd Transportation P2: Design 30% Design Completion 6 $4896793.00 TBD Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the N Boulevard corridor, spanning approximately 1.75 miles from W Green St to W Dr MLK Blvd. N Boulevard is a collector roadway serving as a critical access route for the West River, Tampa Heights, Ridgewood Park and Riverside Heights neighborhoods. The project will include:
• Roadway resurfacing
• Improved pavement markings
• ADA pedestrian ramps
East Arbor Heights_West Phase I Water P2: Design 60% Design Completion 5 $2432989.55 2027 PIPES Approximately 6,821 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Oakford Park Phase I Water P2: Design 60% Design Completion 6 $3499580.93 2028 PIPES Approximately 15,211 linear feet of water mains ranging from 2 to 4 inches in diameter will be replaced and upgraded.
Foundation for Tampa's Neighborhoods Project_Forest Hills Area Water P5: Closeout Closeout 7 $5454315.43 2022 PIPES

The Foundation for Tampa’s Neighborhoods Project_Forest Hills Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 66,070 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.

Foundation for Tampa’s Neighborhoods Project_Virginia Park Area Water P5: Closeout Closeout 4 $8677855.56 2022 PIPES

The Foundation for Tampa’s Neighborhoods Project_Virginia Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 40,333 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.

Foundation for Tampa’s Neighborhoods Project_MacFarlane Park Area Water P5: Closeout Closeout 6 $7124488.05 2022 PIPES The Foundation for Tampa’s Neighborhoods Project_MacFarlane Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 53,021 Linear Feet of water mains ranging from 2 to 24 inches in diameter will be replaced and upgraded.
Yorkshire Water P5: Closeout Closeout $8709704.34 2024 PIPES The Yorkshire project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 25,730 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
NTCB 99th Ave East -Pond Expansion Stormwater Engineering P5: Closeout Closeout 7 $100000.00 2024 Stormwater Improvement Fee

Property acquisition and pond expansion

Sidewalks- Old Seminole Heights (E Park Cir, Hilton Pl, & E Broad St) Transportation P5: Closeout Closeout 6 $190000.00 2024 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Sidewalks- Bay to Bay Blvd (MacDill Ave to Ysabella Ave) Transportation P5: Closeout Closeout 4 $156800.00 2023 Sidewalk In-Lieu Fees

This project provides for new sidewalk.

Neighborhood Improvements- Belmar Shores Transportation P5: Closeout Closeout 4 $1346000.00 2023 Grants

This project provides for street resurfacing within the Belmar Shores Neighborhood.

JPA- FDOT Height Multimodal Improvements Wastewater P2: Design 60% Design Completion 5 $1000000.00 2027 PIPES This project provides for the relocation of gravity mains that will be impacted based upon the FDOT’s proposed roadway and drainage improvements project.
Sunset Park West_A Water P5: Closeout Closeout 4 $4670025.80 2021 PIPES

The Sunset Park West_A project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 19,202 Linear Feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.

Beach Place Water P3: Procurement Project Startup 4 $288684.81 2028 PIPES Approximately 992 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
Palmetto Beach Water P2: Design 30% Design Completion 5 $1121350.22 2028 PIPES Approximately 2,348 linear feet of water mains ranging from 8 to 12 inches in diameter will be replaced.
SE Lake Carroll WM Replacement Water P2: Design 30% Design Completion $3540279.16 2027 PIPES Approximately 10,113 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Himes and Idlewild FM Replacement Wastewater P2: Design 90% Design Completion $101000.00 2028 PIPES This project provides for the replacement of the force main that serves the Private Pump Station north of Hillsborough on Himes Ave. Proposed 950 feet of 8” force main on Himes Ave north of Hillsborough Ave to Idlewild Ave.
Tampa Heights WM Replacement Phase II Water P2: Design 30% Design Completion 5 $1447393.74 2028 PIPES Approximately 3,572 linear feet of water mains ranging from 6 to 8 inches in diameter will be replaced.
North Ybor Phase I Water P2: Design 60% Design Completion 5 $3435469.56 2028 PIPES Approximately 9,604 linear feet of water mains ranging from 2 to 12 inches in diameter will be replaced.
Tampa Heights WM Replacement Phase I Water P2: Design 30% Design Completion 5 $1536564.04 2028 PIPES Approximately 4,312 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
East Arbor Heights_East Phase I Water P2: Design 60% Design Completion 5 $9154599.74 2027 PIPES Approximately 26,964 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced.
Swann Ave WM Replacement Water P2: Design 30% Design Completion 4 $4297504.96 2028 PIPES Approximately 11,386 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Tampa Heights WM Replacement Phase III Water P2: Design 30% Design Completion 5 $1843418.60 2028 PIPES Approximately 5,146 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.