All Capital Improvement Projects

This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.

Displaying 176 - 196 of 196
Title Project Type Project Phase Planned Start Date Planned End Date Status Council District Estimated Cost Fiscal Year Funding Source Description
Hanna Avenue Municipal Building Renovations - Design Build Facility Management P5: Closeout Final Inspection and Testing 5 $101112026.00 2021 Tax - Other

Professional Design-Build services associated with the Hanna Avenue Municipal Building Renovations. The scope shall include, but not be limited to the following: Programming, Full design services, Renovation of existing building and site, Planning and coordination to assist the City in relocating three (3) City Departments to this facility at locations to be determined, Development of GMP for construction, Scheduling of all logistics.

Coachman Ave Water P2: Design 30% Design Completion 4 $6753985.65 2030 PIPES Approximately 16,970 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Sligh Ave & 30th St (Signal) Transportation P5: Closeout Closeout 5 $300000.00 2025 Local Option Gas Tax This project is for the construction of a new traffic signal installation at the intersection of E Sligh Ave & N 30th St the project will include new vehicular traffic signal heads along with new pedestrian signal heads.
N 24th Street (Hanna Ave to Sligh Ave) Transportation P2: Design 60% Design Completion 5 $400000.00 2027 Multiple Funding

This project provides for design and construction of capacity and multimodal improvements along the E Hanna Ave corridor from N 22nd St to N 30th Sr., along the 24th St from Hanna Ave to Sligh Ave, and at the intersection of Sligh Ave and 30th St. The project includes the following proposed improvements:

  1. Hanna Avenue – 22nd Street to 30th Street:
    • Roadway milling and resurfacing.
    • Westbound Left Turn Lane into the new City Center at 2515 Hanna Ave.
    • Intersection improvements at the intersection of Hanna Ave at N 22nd St and Hanna Ave at N 30th St
  2. 24th Street – Hanna Avenue to Sligh Avenue:
    • Sidewalk along the west side of 24th St
    • All Way Stop Signs at “T” intersection along 24th St
  3. Intersection at the Sligh Avenue and 30th Street:
    • New Traffic Signal
    • Northbound Left-Turn Lane.
N Grady Ave Ditch Rehabilitation Stormwater Engineering P5: Closeout Closeout 6 $1300000.00 2025 Stormwater Improvement Fee The project is located on the east side of N Grady Avenue, just south of W Spruce Street, and is identified as part of the Grady Avenue Drainage Improvements. The work includes demolition of trees and guardrail, installation of ten (10) storm sewer structures and large diameter piping to enclose an existing 800-ft ditch corridor. Improvements include approximately 200 feet of 36‑inch reinforced concrete pipe (RCP) and approximately 490 feet of 60x38‑inch elliptical reinforced concrete pipe (ERCP), along with all related miscellaneous and appurtenant work needed to enhance conveyance and corridor safety.
O'Brien St - Segment 1 (Cypress St. to Spruce St.) Transportation P5: Closeout Closeout 6 $651450.00 2025 Other Agencies Perform full depth reclamation and resurfacing of N O'Brien Street between W Cypress Street and W Spruce Street and install pavement marking improvements including share the road markings.
Hanna Avenue Phase 1 (24th St to CSX RR) Transportation P2: Design 30% Design Completion 5 $1670096.00 2030 Yet to be Determined Reprofiling of Hanna Avenue in front of City Center
MLK Resurfacing from Air Cargo to Dale Mabry Transportation P5: Closeout Closeout 6 $950000.00 2026 Local Option Gas Tax Pavement resurfacing
Franklin St and Fort Brooke Garage - Blank Out Signs Transportation P5: Closeout Closeout 5 $72000.00 2026 Yet to be Determined This project will provide the in-house design of a new blank out signs in the median at Franklin Street and the Foot Brooke garage for enhanced safety for motorists and the streetcar.
N Boulevard Resurfacing from W Green St to W Dr MLK Blvd Transportation P2: Design 30% Design Completion 6 $4896793.00 TBD Tax - Other This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the N Boulevard corridor, spanning approximately 1.75 miles from W Green St to W Dr MLK Blvd. N Boulevard is a collector roadway serving as a critical access route for the West River, Tampa Heights, Ridgewood Park and Riverside Heights neighborhoods. The project will include:
  • Roadway resurfacing
  • Improved pavement markings
  • ADA pedestrian ramps
SE Lake Carroll WM Replacement Water P2: Design 30% Design Completion $3540279.16 2027 PIPES Approximately 10,113 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Belmont Heights Gravity Sewer Rehabilitation by CIPP Lining Wastewater P2: Design 30% Design Completion 5 $7970000.00 2027 PIPES This project includes the rehabilitation of approximately 143,264 linear feet of 8-inch, 5,581 linear feet of 10-inch, 1,604 linear feet of 12-inch, 3,317 linear feet of 15-inch, and 3,744 linear feet of 18-inch diameter gravity sewers and the rehabilitation of manholes.
Busch Blvd Trunk Sewer Rehabilitation by CIPP Lining Wastewater P2: Design 30% Design Completion 7 $1500000.00 2027 PIPES This project includes the rehabilitation of approximately 4,660 linear feet of 8-inch, 1,130 linear feet of 10-inch, 504 linear feet of 12-inch, 1,421 linear feet of 18-inch, 1,751 linear feet of 21-inch, 855 linear feet of 24-inch and 2,624 linear feet of 30-inch diameter gravity sewers.
Warren Ave WM Replacement Water P2: Design 30% Design Completion 5 $208152.11 2028 PIPES Approximately 581 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
East Arbor Heights_West Phase I Water P2: Design 60% Design Completion 5 $2432989.55 2027 PIPES Approximately 6,821 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Tampa Heights WM Replacement Phase II Water P2: Design 30% Design Completion 5 $1447393.74 2028 PIPES Approximately 3,572 linear feet of water mains ranging from 6 to 8 inches in diameter will be replaced.
Tampa Heights WM Replacement Phase I Water P2: Design 30% Design Completion 5 $1536564.04 2028 PIPES Approximately 4,312 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.
East Arbor Heights_East Phase I Water P2: Design 60% Design Completion 5 $9154599.74 2027 PIPES Approximately 26,964 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced.
Louisiana Ave Water Pipe Replacement Water P2: Design 60% Design Completion 5 $230346.81 2027 PIPES Approximately 679 linear feet of 2 inch diameter water main will be replaced and upgraded.
Swann Ave WM Replacement Water P2: Design 30% Design Completion 4 $4297504.96 2028 PIPES Approximately 11,386 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded.
Tampa Heights WM Replacement Phase III Water P2: Design 30% Design Completion 5 $1843418.60 2028 PIPES Approximately 5,146 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded.