All Capital Improvement Projects
This is list of our Capital Improvement Projects to learn more visit our Capital Improvement Projects landing page.
| Title | Project Type | Project Phase | Planned Start Date | Planned End Date | Status | Council District | Estimated Cost | Fiscal Year | Funding Source | Description |
|---|---|---|---|---|---|---|---|---|---|---|
| N Grady Ave Ditch Rehabilitation | Stormwater Engineering | P4: Construction | Final Contract Review & Approval | 6 | $1270000.00 | 2025 | Stormwater Improvement Fee | Project area is located on the east side of N Grady Avenue south of W Spruce Street as is identified as the Grady Avenue Drainage Improvements. Work involves demolition of trees and guardrail, installation of ten (10) storm sewer structures and large diameter piping to enclose an existing 800-ft ditch corridor. Work includes approximately 200 feet of 36” RCP pipe and approximately 490 feet of 60”x38” ERCP pipe. and all miscellaneous and appurtenant work. | ||
| MLK Resurfacing from Air Cargo to Dale Mabry | Transportation | P4: Construction | Construction in Progress | 6 | $950000.00 | 2026 | Local Option Gas Tax | Pavement resurfacing | ||
| N Boulevard Resurfacing from W Green St to W Dr MLK Blvd | Transportation | P2: Design | 30% Design Completion | 6 | $4896793.00 | TBD | Tax - Other | This is a subproject of the Hillsborough County Resurfacing Tax Project funded by the AFT Surtax Network Operating Fund. The project provides pavement resurfacing, pedestrian accessibility and safety improvements along the N Boulevard corridor, spanning approximately 1.75 miles from W Green St to W Dr MLK Blvd. N Boulevard is a collector roadway serving as a critical access route for the West River, Tampa Heights, Ridgewood Park and Riverside Heights neighborhoods. The project will include: • Roadway resurfacing • Improved pavement markings • ADA pedestrian ramps |
||
| East Arbor Heights_West Phase I | Water | P2: Design | 60% Design Completion | 5 | $2432989.55 | 2027 | PIPES | Approximately 6,821 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded. | ||
| Oakford Park Phase I | Water | P2: Design | 60% Design Completion | 6 | $3499580.93 | 2028 | PIPES | Approximately 15,211 linear feet of water mains ranging from 2 to 4 inches in diameter will be replaced and upgraded. | ||
| Foundation for Tampa's Neighborhoods Project_Forest Hills Area | Water | P5: Closeout | Closeout | 7 | $5454315.43 | 2022 | PIPES | The Foundation for Tampa’s Neighborhoods Project_Forest Hills Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 66,070 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded. |
||
| Foundation for Tampa’s Neighborhoods Project_Virginia Park Area | Water | P5: Closeout | Closeout | 4 | $8677855.56 | 2022 | PIPES | The Foundation for Tampa’s Neighborhoods Project_Virginia Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 40,333 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded. |
||
| Foundation for Tampa’s Neighborhoods Project_MacFarlane Park Area | Water | P5: Closeout | Closeout | 6 | $7124488.05 | 2022 | PIPES | The Foundation for Tampa’s Neighborhoods Project_MacFarlane Park Area will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 53,021 Linear Feet of water mains ranging from 2 to 24 inches in diameter will be replaced and upgraded. | ||
| Yorkshire | Water | P5: Closeout | Closeout | $8709704.34 | 2024 | PIPES | The Yorkshire project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 25,730 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded. | |||
| NTCB 99th Ave East -Pond Expansion | Stormwater Engineering | P5: Closeout | Closeout | 7 | $100000.00 | 2024 | Stormwater Improvement Fee | Property acquisition and pond expansion |
||
| Sidewalks- Old Seminole Heights (E Park Cir, Hilton Pl, & E Broad St) | Transportation | P5: Closeout | Closeout | 6 | $190000.00 | 2024 | Sidewalk In-Lieu Fees | This project provides for new sidewalk. |
||
| Sidewalks- Bay to Bay Blvd (MacDill Ave to Ysabella Ave) | Transportation | P5: Closeout | Closeout | 4 | $156800.00 | 2023 | Sidewalk In-Lieu Fees | This project provides for new sidewalk. |
||
| Neighborhood Improvements- Belmar Shores | Transportation | P5: Closeout | Closeout | 4 | $1346000.00 | 2023 | Grants | This project provides for street resurfacing within the Belmar Shores Neighborhood. |
||
| JPA- FDOT Height Multimodal Improvements | Wastewater | P2: Design | 60% Design Completion | 5 | $1000000.00 | 2027 | PIPES | This project provides for the relocation of gravity mains that will be impacted based upon the FDOT’s proposed roadway and drainage improvements project. | ||
| Sunset Park West_A | Water | P5: Closeout | Closeout | 4 | $4670025.80 | 2021 | PIPES | The Sunset Park West_A project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also improve our ability to serve a growing population. Approximately 19,202 Linear Feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded. |
||
| Beach Place | Water | P3: Procurement | Project Startup | 4 | $288684.81 | 2028 | PIPES | Approximately 992 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. | ||
| Palmetto Beach | Water | P2: Design | 30% Design Completion | 5 | $1121350.22 | 2028 | PIPES | Approximately 2,348 linear feet of water mains ranging from 8 to 12 inches in diameter will be replaced. | ||
| SE Lake Carroll WM Replacement | Water | P2: Design | 30% Design Completion | $3540279.16 | 2027 | PIPES | Approximately 10,113 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded. | |||
| Himes and Idlewild FM Replacement | Wastewater | P2: Design | 90% Design Completion | $101000.00 | 2028 | PIPES | This project provides for the replacement of the force main that serves the Private Pump Station north of Hillsborough on Himes Ave. Proposed 950 feet of 8” force main on Himes Ave north of Hillsborough Ave to Idlewild Ave. | |||
| Tampa Heights WM Replacement Phase II | Water | P2: Design | 30% Design Completion | 5 | $1447393.74 | 2028 | PIPES | Approximately 3,572 linear feet of water mains ranging from 6 to 8 inches in diameter will be replaced. | ||
| North Ybor Phase I | Water | P2: Design | 60% Design Completion | 5 | $3435469.56 | 2028 | PIPES | Approximately 9,604 linear feet of water mains ranging from 2 to 12 inches in diameter will be replaced. | ||
| Tampa Heights WM Replacement Phase I | Water | P2: Design | 30% Design Completion | 5 | $1536564.04 | 2028 | PIPES | Approximately 4,312 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. | ||
| East Arbor Heights_East Phase I | Water | P2: Design | 60% Design Completion | 5 | $9154599.74 | 2027 | PIPES | Approximately 26,964 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced. | ||
| Swann Ave WM Replacement | Water | P2: Design | 30% Design Completion | 4 | $4297504.96 | 2028 | PIPES | Approximately 11,386 linear feet of water mains ranging from 2 to 8 inches in diameter will be replaced and upgraded. | ||
| Tampa Heights WM Replacement Phase III | Water | P2: Design | 30% Design Completion | 5 | $1843418.60 | 2028 | PIPES | Approximately 5,146 linear feet of water mains ranging from 2 to 6 inches in diameter will be replaced and upgraded. |
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.