
The following is a list of typical inspections needed for Residential Additions:
- BLD - Pre-construction
- BLD - Footer/Ufer Bond
- BLD - Stem Wall
- PLB - Underground rough
- ELE - Underground rough
- BLD - On Grade Slab/Monolithic Slab
- BLD - Tie Beam
- BLD - Wall or Roof Sheathing
- PLB - Gas Rough-In
- PLB - Rough-In
- PLB-Tub Set
- ELE-Rough-In
- MEC-Rough-In
- BLD-Framing
- BLD-Insulation – Walls
- BLD-Insulation – Ceilings
- ELE-Final
- MEC-Final
- PLB-Final
- PLB-Gas Final
- BLD-Comprehensive-BLD-EL-ME-PL-GAS-Final
Above Inspections list is provide as a guide. Additional inspections may be required, depending on the project scope of work. Consult with your Building Inspector.
*A BLD-Historic Progress inspection may be required, if your property is located on a historic zone
Select an option below to obtain additional information about each stage in Residential Additions permit process
Application Guide
Fees
Plan Review
Inspections
RFC (Ready For Completion)