The following is a list of typical inspections needed for New Residential Construction:
- BLD-Pre-Construction Inspection
- BLD- Footer/Ufer Bond
- BLD- Stem Wall
- PLB-Underground Rough-In
- ELE-Underground Rough-In
- ELE-Footer/Ufer Bond
- BLD- Above Grade Slab
- BLD-Elevation Certificate Check
- BLD-On Grade Slab/Monolithic Slab
- BLD-Tie Beam
- BLD-Wall or Roof Sheathing
- PLB-Gas Rough-In
- PLB-Rough-In
- PLB-Tub Set
- MEC-Rough-In
- ELE-Rough-In
- BLD-Framing
- BLD-Insulation - Walls
- PLB-Sewer
- PLB-Water Service
- BLD-Driveway or Sidewalk Pre-Pour
- BLD-Final Grading-Drainage
- ELE-Electrical power Release
- ROF – Final
- BLD-Tree Replacement Check
- PLB-Final
- BLD-Insulation – Ceiling
- ELE - Final
- MEC-Final
- BLD-Site Final
- BLD-Final
Above Inspections list is provide as a guide. Additional inspections may be required, depending on the project scope of work. Consult with your Building Inspector.
Select an option below to obtain additional information about each stage in New Residential Construction permit process
Application
Fees
Plan Review
Inspections
RFC (Ready For Completion)